MauryaHub PYQ Practice

Business Analytics · End Term · Jan 2025 · AN

Business Analytics · End Term · Jan 2025 AN

← Course papers · Start practice / exam

Questions and published explanations below are available without starting a test. Some questions may not have a published solution yet.

0 / 31 published solutions

Question 366 MCQ · 3.0 marks

Suppose the researcher decides to increase the sample size 64 to 100 while keeping the same rejection threshold. What will be effect on level of significance?
A.
The significance level will increase from 0.05 to 0.09.
B.
The significance level will be same.
C.
The significance level will decrease from 0.09 to 0.01.
D.
The significance level will decrease from 0.09 to 0.05.       **Business Analytics** **Section Id :** 64065387644 **Section Number :** 14 **Section type :** Online **Mandatory or Optional :** Mandatory **Number of Questions :** 13 **Number of Questions to be attempted :** 13 **Section Marks :** 45 **Display Number Panel :** Yes **Section Negative Marks :** 0 **Group All Questions :** No **Enable Mark as Answered Mark for Review and** No **Clear Response :** **Section Maximum Duration :** 0 **Section Minimum Duration :** 0 **Section Time In :** Minutes **Maximum Instruction Time :** 0

A published solution is not available for this question yet.

Report a correction for Q366

Question 368 NAT · 1.0 marks

Four teams (1, 2, 3 and 4) have qualified for the final of the cricket world cup. Team 1 plays Team 2. Team 3 plays Team 4. The winners then play for final. In a game between Team “i” and Team “j”, the probability of team “i” winning is given by {i /(i+j)}. Then what is the conditional probability that “Team 1” will win the World Cup? (Note: Enter your **answer in decimals** rounded to two decimal places. For example, if your answer is “0.245”, **enter it as “0.25”**)

A published solution is not available for this question yet.

Report a correction for Q368

Question 369 NAT · 1.5 marks

The monthly electric power consumed by the paint shop in an automobile assembly line is thought to be related to “Average ambient temperature (X1)”, “Number of working days in the month (X2)” and “Total surface area that is painted (X3)”. The past historical data (in Table-1) was used to build a model containing these variables and the developed regression model is provided below. Electric Power Consumed = 857.75+ 4.25*X1 – 40.75*X2 + 3.45*X3
Source diagram or notation
Given this information, answer the subquestions.
What is the R-square value of the model? (Note: Enter your **answer in decimals** rounded to two decimal places. For example, if your answer is “0.456” **enter it as “0.46”**)

A published solution is not available for this question yet.

Report a correction for Q369

Question 370 NAT · 1.5 marks

The monthly electric power consumed by the paint shop in an automobile assembly line is thought to be related to “Average ambient temperature (X1)”, “Number of working days in the month (X2)” and “Total surface area that is painted (X3)”. The past historical data (in Table-1) was used to build a model containing these variables and the developed regression model is provided below. Electric Power Consumed = 857.75+ 4.25*X1 – 40.75*X2 + 3.45*X3
Source diagram or notation
Given this information, answer the subquestions.
What is the Adjusted R-square value of the model? (Note: Enter your **answer in decimals** rounded to two decimal places. For example, if your answer is “0.456” **enter it as “0.46”**)

A published solution is not available for this question yet.

Report a correction for Q370

Question 371 NAT · 1.0 marks

The monthly electric power consumed by the paint shop in an automobile assembly line is thought to be related to “Average ambient temperature (X1)”, “Number of working days in the month (X2)” and “Total surface area that is painted (X3)”. The past historical data (in Table-1) was used to build a model containing these variables and the developed regression model is provided below. Electric Power Consumed = 857.75+ 4.25*X1 – 40.75*X2 + 3.45*X3
Source diagram or notation
Given this information, answer the subquestions.
What is the expected power that will be consumed on a day when X1 = 25, X2 = 24 and X3 = 100? (Note: Enter your **answer in decimals** rounded to two decimal places. For example, if your answer is “123.456” **enter it as “123.46”**)

A published solution is not available for this question yet.

Report a correction for Q371

Question 372 NAT · 1.0 marks

The monthly electric power consumed by the paint shop in an automobile assembly line is thought to be related to “Average ambient temperature (X1)”, “Number of working days in the month (X2)” and “Total surface area that is painted (X3)”. The past historical data (in Table-1) was used to build a model containing these variables and the developed regression model is provided below. Electric Power Consumed = 857.75+ 4.25*X1 – 40.75*X2 + 3.45*X3
Source diagram or notation
Given this information, answer the subquestions.
Say Table-2 is a correlation matrix between the different variables used to build the regression model. What is the VIF between “X1” and “X3”? (Note: Enter your **answer in decimals** rounded to two decimal places. For example, if your answer is “123.456” **enter it as “123.46”**)
Source diagram or notation

A published solution is not available for this question yet.

Report a correction for Q372

Question 373 NAT · 2.5 marks

The BA discourse is often cluttered with queries / requests related to solutions for Past Year Question Papers (PYQP). The course instructor, Dr. Milo, had been informing that students need to put in effort to find solutions by searching the discourse. However, the results seem to disappointing. Therefore, Dr. Milo wanted to do a few basic analytics on discourse behaviour of students. Past student data was collected for the analysis. Past data was collected for the BA terms in Jan-2022, May-2022, Sep-2022, Jan-2023, May-2023 and Sep-2023. For each term, 100 randomly selected unique student IDs were sampled. Of the 100 student IDs, 50 were “Male” and the remaining were “Female”. The learners in the discourse have either “followed the instructions” or “not followed the instructions” or “have not accessed the discourse at all” (these three are referred to as access categories). Specifically, for the sample data in the different terms (in sequence of earliest term to latest term i.e. Jan-2022 to Sep-2023) it was observed that • For the Male sample: 20, 30, 25, 45, 25 and 35 had followed the instructions (respectively in each term i.e 20 male learners had followed the instructions in Jan-2022 term and so on) • For the Male sample: 2, 10, 5, 4, 5 and 3 had not accessed discourse at all (respectively in each term i.e 2 male learners had not accessed discourse at all in Jan-2022 term and so on) • For the female sample: 15, 22, 32, 25, 20 and 20 had followed the instructions (respectively in each term i.e 15 female learners had followed the instructions in Jan-2022 term and so on) and the remaining learners in the respective female sample had not followed the instructions Moreover, Dr. Milo assumes **that all learners in the “followed the instructions” category** are Normally distributed with a mean of 18 and standard deviation of 4. Each BA term is taken as a sample point to identify the required counts (for this specific analysis). A binning of data is performed with the following three bins (which capture the number of learners who follow the instructions in a sample). The bins divide the solution space into equal areas. Bin-1: [less than or equal to 35] Bin-2: [36 to less than or equal to 50] Bin-3: [51 to less than or equal to 100] Given this information, answer the subquestions
If Dr. Milo is interested to see **only if** “Male Learners” in different “Access Categories” in different terms are independent, then what is the value of the test statistic? (Note: Enter the answer **rounded** **to two decimal places.** For example, if the answer is “1.235”, **then enter it as “1.24”**)

A published solution is not available for this question yet.

Report a correction for Q373

Question 374 NAT · 2.0 marks

The BA discourse is often cluttered with queries / requests related to solutions for Past Year Question Papers (PYQP). The course instructor, Dr. Milo, had been informing that students need to put in effort to find solutions by searching the discourse. However, the results seem to disappointing. Therefore, Dr. Milo wanted to do a few basic analytics on discourse behaviour of students. Past student data was collected for the analysis. Past data was collected for the BA terms in Jan-2022, May-2022, Sep-2022, Jan-2023, May-2023 and Sep-2023. For each term, 100 randomly selected unique student IDs were sampled. Of the 100 student IDs, 50 were “Male” and the remaining were “Female”. The learners in the discourse have either “followed the instructions” or “not followed the instructions” or “have not accessed the discourse at all” (these three are referred to as access categories). Specifically, for the sample data in the different terms (in sequence of earliest term to latest term i.e. Jan-2022 to Sep-2023) it was observed that • For the Male sample: 20, 30, 25, 45, 25 and 35 had followed the instructions (respectively in each term i.e 20 male learners had followed the instructions in Jan-2022 term and so on) • For the Male sample: 2, 10, 5, 4, 5 and 3 had not accessed discourse at all (respectively in each term i.e 2 male learners had not accessed discourse at all in Jan-2022 term and so on) • For the female sample: 15, 22, 32, 25, 20 and 20 had followed the instructions (respectively in each term i.e 15 female learners had followed the instructions in Jan-2022 term and so on) and the remaining learners in the respective female sample had not followed the instructions Moreover, Dr. Milo assumes **that all learners in the “followed the instructions” category** are Normally distributed with a mean of 18 and standard deviation of 4. Each BA term is taken as a sample point to identify the required counts (for this specific analysis). A binning of data is performed with the following three bins (which capture the number of learners who follow the instructions in a sample). The bins divide the solution space into equal areas. Bin-1: [less than or equal to 35] Bin-2: [36 to less than or equal to 50] Bin-3: [51 to less than or equal to 100] Given this information, answer the subquestions
What is the value of the computed test statistic which will be used to check if Dr. Milo’s assumption that all learners in the “followed the instructions” category are Normally distributed? (Note: Enter the answer **rounded to two decimal places.** For example, if the answer is “1.235”, **then enter it as** **“1.24”**)

A published solution is not available for this question yet.

Report a correction for Q374

Question 375 NAT · 0.5 marks

The BA discourse is often cluttered with queries / requests related to solutions for Past Year Question Papers (PYQP). The course instructor, Dr. Milo, had been informing that students need to put in effort to find solutions by searching the discourse. However, the results seem to disappointing. Therefore, Dr. Milo wanted to do a few basic analytics on discourse behaviour of students. Past student data was collected for the analysis. Past data was collected for the BA terms in Jan-2022, May-2022, Sep-2022, Jan-2023, May-2023 and Sep-2023. For each term, 100 randomly selected unique student IDs were sampled. Of the 100 student IDs, 50 were “Male” and the remaining were “Female”. The learners in the discourse have either “followed the instructions” or “not followed the instructions” or “have not accessed the discourse at all” (these three are referred to as access categories). Specifically, for the sample data in the different terms (in sequence of earliest term to latest term i.e. Jan-2022 to Sep-2023) it was observed that • For the Male sample: 20, 30, 25, 45, 25 and 35 had followed the instructions (respectively in each term i.e 20 male learners had followed the instructions in Jan-2022 term and so on) • For the Male sample: 2, 10, 5, 4, 5 and 3 had not accessed discourse at all (respectively in each term i.e 2 male learners had not accessed discourse at all in Jan-2022 term and so on) • For the female sample: 15, 22, 32, 25, 20 and 20 had followed the instructions (respectively in each term i.e 15 female learners had followed the instructions in Jan-2022 term and so on) and the remaining learners in the respective female sample had not followed the instructions Moreover, Dr. Milo assumes **that all learners in the “followed the instructions” category** are Normally distributed with a mean of 18 and standard deviation of 4. Each BA term is taken as a sample point to identify the required counts (for this specific analysis). A binning of data is performed with the following three bins (which capture the number of learners who follow the instructions in a sample). The bins divide the solution space into equal areas. Bin-1: [less than or equal to 35] Bin-2: [36 to less than or equal to 50] Bin-3: [51 to less than or equal to 100] Given this information, answer the subquestions
How many degrees of freedom is present for the hypothesis test used to check if Dr. Milo’s assumption that all learners in the “followed the instructions” category are Normally distributed?

A published solution is not available for this question yet.

Report a correction for Q375

Question 376 NAT · 1.0 marks

A logistic regression model is built to classify images of automobiles into three classes (“Car”, “Bus” and “Auto”). The built model gave the below confusion matrix (in Table-3) for a sample of 130 images.
Source diagram or notation
Given this information answer the subquestions.
What is the accuracy of the model? (Note: **Enter your answer in percentage** rounded to two decimal places. Eg: If your answer is “10.256%”, then **enter the answer as “10.26”**)

A published solution is not available for this question yet.

Report a correction for Q376

Question 377 NAT · 1.0 marks

A logistic regression model is built to classify images of automobiles into three classes (“Car”, “Bus” and “Auto”). The built model gave the below confusion matrix (in Table-3) for a sample of 130 images.
Source diagram or notation
Given this information answer the subquestions.
What is the recall for the model to predict a “Car”? (Note: **Enter your answer in percentage** rounded to two decimal places. Eg: If your answer is “10.256%”, then **enter the answer as “10.26”**)

A published solution is not available for this question yet.

Report a correction for Q377

Question 378 NAT · 2.0 marks

“Milo’s Computation Solutions (MCS)” makes different types of calculators and measuring applications. Currently, the company is preparing to introduce two new calculators: “Financial Calculator” and “Technical Calculator”. Each of the new calculator has three components: “Base”, “Electronic Cartridge” and “Top”. The same base is used for both calculators. However, the “Top” and “Electronic Cartridge” are different for the two calculators. All components can be manufactured by MCS or can be purchased from outside suppliers. The cost for manufacturing a component and the cost for component purchase (referred to as purchase cost) from a supplier is presented in Table-4.
Source diagram or notation
MCS has planned to make 3000 Financial Calculators and 2000 Technical Calculators. However, manufacturing capacity is limited. A total of 200 hours of regular manufacturing capacity is available and a total of 50 hours of overtime is available to MCS for making the different components. It is noted that overtime involves a premium at the additional cost of ₹9 per hour. The manufacturing times required to manufacture the different components is presented in Table-5 below. The time required to assemble the components to make any calculator is considered to be 0 (negligible).
Source diagram or notation
The problem faced by MCS is to determine how many units of each component to manufacture and how many units of each component to purchase in order to minimize the total cost for satisfying the demand. The company does not hold any inventory for components and wants to ensure all demand is met. Given this information, answer the subquestions.
How many (count of) decision variables are present in the standard form of the primal linear programming formulation of the problem?

A published solution is not available for this question yet.

Report a correction for Q378

Question 379 NAT · 2.0 marks

“Milo’s Computation Solutions (MCS)” makes different types of calculators and measuring applications. Currently, the company is preparing to introduce two new calculators: “Financial Calculator” and “Technical Calculator”. Each of the new calculator has three components: “Base”, “Electronic Cartridge” and “Top”. The same base is used for both calculators. However, the “Top” and “Electronic Cartridge” are different for the two calculators. All components can be manufactured by MCS or can be purchased from outside suppliers. The cost for manufacturing a component and the cost for component purchase (referred to as purchase cost) from a supplier is presented in Table-4.
Source diagram or notation
MCS has planned to make 3000 Financial Calculators and 2000 Technical Calculators. However, manufacturing capacity is limited. A total of 200 hours of regular manufacturing capacity is available and a total of 50 hours of overtime is available to MCS for making the different components. It is noted that overtime involves a premium at the additional cost of ₹9 per hour. The manufacturing times required to manufacture the different components is presented in Table-5 below. The time required to assemble the components to make any calculator is considered to be 0 (negligible).
Source diagram or notation
The problem faced by MCS is to determine how many units of each component to manufacture and how many units of each component to purchase in order to minimize the total cost for satisfying the demand. The company does not hold any inventory for components and wants to ensure all demand is met. Given this information, answer the subquestions.
Excluding the non-negativity constraint, how many (count of) constraints are present in the standard form of the primal linear programming formulation of the problem?

A published solution is not available for this question yet.

Report a correction for Q379

Question 380 NAT · 1.5 marks

“Milo’s Computation Solutions (MCS)” makes different types of calculators and measuring applications. Currently, the company is preparing to introduce two new calculators: “Financial Calculator” and “Technical Calculator”. Each of the new calculator has three components: “Base”, “Electronic Cartridge” and “Top”. The same base is used for both calculators. However, the “Top” and “Electronic Cartridge” are different for the two calculators. All components can be manufactured by MCS or can be purchased from outside suppliers. The cost for manufacturing a component and the cost for component purchase (referred to as purchase cost) from a supplier is presented in Table-4.
Source diagram or notation
MCS has planned to make 3000 Financial Calculators and 2000 Technical Calculators. However, manufacturing capacity is limited. A total of 200 hours of regular manufacturing capacity is available and a total of 50 hours of overtime is available to MCS for making the different components. It is noted that overtime involves a premium at the additional cost of ₹9 per hour. The manufacturing times required to manufacture the different components is presented in Table-5 below. The time required to assemble the components to make any calculator is considered to be 0 (negligible).
Source diagram or notation
The problem faced by MCS is to determine how many units of each component to manufacture and how many units of each component to purchase in order to minimize the total cost for satisfying the demand. The company does not hold any inventory for components and wants to ensure all demand is met. Given this information, answer the subquestions.
MCS has decided to manufacture 500 Bases, 666 Electronic Cartridge for Financial Calculators, and 2000 Tops for Technical Calculator. Additionally, MCS has decided to purchase 2334 Electronic Cartridge for Financial Calculators, 3000 Tops for Financial Calculators and 2000 Tops for Technical Calculators. Then, what is the objective function value for the standard form of the primal linear programming formulation of the problem? (Note: enter your answer in “Rupees” **rounded to two decimal places** without the “₹” symbol. For example, if your answer is “₹123.56” then **enter it as “123.56”**)

A published solution is not available for this question yet.

Report a correction for Q380

Question 381 NAT · 1.5 marks

“Milo’s Computation Solutions (MCS)” makes different types of calculators and measuring applications. Currently, the company is preparing to introduce two new calculators: “Financial Calculator” and “Technical Calculator”. Each of the new calculator has three components: “Base”, “Electronic Cartridge” and “Top”. The same base is used for both calculators. However, the “Top” and “Electronic Cartridge” are different for the two calculators. All components can be manufactured by MCS or can be purchased from outside suppliers. The cost for manufacturing a component and the cost for component purchase (referred to as purchase cost) from a supplier is presented in Table-4.
Source diagram or notation
MCS has planned to make 3000 Financial Calculators and 2000 Technical Calculators. However, manufacturing capacity is limited. A total of 200 hours of regular manufacturing capacity is available and a total of 50 hours of overtime is available to MCS for making the different components. It is noted that overtime involves a premium at the additional cost of ₹9 per hour. The manufacturing times required to manufacture the different components is presented in Table-5 below. The time required to assemble the components to make any calculator is considered to be 0 (negligible).
Source diagram or notation
The problem faced by MCS is to determine how many units of each component to manufacture and how many units of each component to purchase in order to minimize the total cost for satisfying the demand. The company does not hold any inventory for components and wants to ensure all demand is met. Given this information, answer the subquestions.
MCS has decided to manufacture 500 Bases, 666 Electronic Cartridge for Financial Calculators, and 2000 Tops for Technical Calculator. Additionally, MCS has decided to purchase 2334 Electronic Cartridge for Financial Calculators, 3000 Tops for Financial Calculators and 2000 Tops for Technical Calculators. Then, how many (count of ) decision variables will have a **ZERO value** in the Dual formulation which is based on the standard form of the primal linear programming formulation of the problem?

A published solution is not available for this question yet.

Report a correction for Q381

Question 382 MCQ · 1.0 marks

We are interested in understanding the efficiency of 5 Sales Offices. Each of the Sales Offices has the same approved budget of 10,00,000. The sales achieved (in INR), and the potential sales leads (potential customers) are the two outputs. As a Business Analyst, you must formulate a DEA problem using Linear programming for the **Sales Office 2.** Using Table-6, answer the given sub- questions
Source diagram or notation
What is the objective function?
A.Source diagram or notation
B.Source diagram or notation
C.Source diagram or notation
D.Source diagram or notation
E.Source diagram or notation

A published solution is not available for this question yet.

Report a correction for Q382

Question 383 MCQ · 1.0 marks

We are interested in understanding the efficiency of 5 Sales Offices. Each of the Sales Offices has the same approved budget of 10,00,000. The sales achieved (in INR), and the potential sales leads (potential customers) are the two outputs. As a Business Analyst, you must formulate a DEA problem using Linear programming for the **Sales Office 2.** Using Table-6, answer the given sub- questions
Source diagram or notation
What is the type constraint?
A.Source diagram or notation
B.Source diagram or notation
C.Source diagram or notation
D.Source diagram or notation

A published solution is not available for this question yet.

Report a correction for Q383

Question 384 MCQ · 1.0 marks

We are interested in understanding the efficiency of 5 Sales Offices. Each of the Sales Offices has the same approved budget of 10,00,000. The sales achieved (in INR), and the potential sales leads (potential customers) are the two outputs. As a Business Analyst, you must formulate a DEA problem using Linear programming for the **Sales Office 2.** Using Table-6, answer the given sub- questions
Source diagram or notation
Which of them is(are) constraint(s) for the LP problem pertaining to Sales Office 2?
A.Source diagram or notation
B.Source diagram or notation
C.Source diagram or notation
D.Source diagram or notation
E.Source diagram or notation
F.Source diagram or notation
G.Source diagram or notation

A published solution is not available for this question yet.

Report a correction for Q384

Question 385 NAT · 1.5 marks

There are 6 business units. There are two outputs and one input under consideration. You are solving the optimization problem for business unit 2 and find that the efficiency to be 0.75. You find that the dual variables corresponding to the constraints of business units 3 and 5 are non- zero and the dual variables corresponding to the constraints of other units are zero. The dual variables corresponding to the constraints of business units 3 and 5 are 0.4 and 0.35, respectively. You are given the following Table-7 where sales and number of leads are the two outputs.
Source diagram or notation
Using this information, answer the given sub-questions.
How much will the Output 1 in HCU 2?

A published solution is not available for this question yet.

Report a correction for Q385

Question 386 NAT · 1.5 marks

There are 6 business units. There are two outputs and one input under consideration. You are solving the optimization problem for business unit 2 and find that the efficiency to be 0.75. You find that the dual variables corresponding to the constraints of business units 3 and 5 are non- zero and the dual variables corresponding to the constraints of other units are zero. The dual variables corresponding to the constraints of business units 3 and 5 are 0.4 and 0.35, respectively. You are given the following Table-7 where sales and number of leads are the two outputs.
Source diagram or notation
Using this information, answer the given sub-questions.
How much will the Output 2 in HCU 2?

A published solution is not available for this question yet.

Report a correction for Q386

Question 387 MCQ · 1.0 marks

As a Business Analyst, we are trying to find the DMUs that are efficient, where there are 2 outputs (Number of Leads & Sales) and one constant input. Based on the graph in Figure-1 answer the given sub-questions.
Source diagram or notation
Which DMUs are in the economic frontier?
A.
(3,2,1)
B.
(3,2,5)
C.
(4,5,2)
D.
(4,5,1)

A published solution is not available for this question yet.

Report a correction for Q387

Question 388 MCQ · 1.0 marks

As a Business Analyst, we are trying to find the DMUs that are efficient, where there are 2 outputs (Number of Leads & Sales) and one constant input. Based on the graph in Figure-1 answer the given sub-questions.
Source diagram or notation
Which DMUs are the reference units for DMU 2?
A.
(1,4)
B.
(1,5)
C.
(3,5)
D.
(3,1)

A published solution is not available for this question yet.

Report a correction for Q388

Question 389 MCQ · 1.0 marks

As a Business Analyst, we are trying to find the DMUs that are efficient, where there are 2 outputs (Number of Leads & Sales) and one constant input. Based on the graph in Figure-1 answer the given sub-questions.
Source diagram or notation
Which DMUs are the reference units for DMU 3?
A.
(1,4)
B.
(1,3)
C.
(4,5)
D.
(3,4)

A published solution is not available for this question yet.

Report a correction for Q389

Question 390 NAT · 2.0 marks

The Table-8 contains the details of 6 customers who have applied for a bike loan. Based on the two inputs (X1 & X2), the bank must decide whether to provide the bike loan or not. In addition, the actual decision on the loan is provided in the column (Y_act).
Source diagram or notation
A senior business analyst used logistic regression to compute the values in Table-9. Based on the data provided answer the given sub-questions.
Source diagram or notation
What is the accuracy of the logistic regression model? (Note: Enter the answer in **“percentage** **rounded to two decimal places** without the percentage sign. For example, if the answer is “1.234%”, **then enter it as “1.23”**)

A published solution is not available for this question yet.

Report a correction for Q390

Question 391 NAT · 2.0 marks

The Table-8 contains the details of 6 customers who have applied for a bike loan. Based on the two inputs (X1 & X2), the bank must decide whether to provide the bike loan or not. In addition, the actual decision on the loan is provided in the column (Y_act).
Source diagram or notation
A senior business analyst used logistic regression to compute the values in Table-9. Based on the data provided answer the given sub-questions.
Source diagram or notation
What is the precision of class 1? (Note: Enter the answer in **“percentage rounded to two decimal** **places** without the percentage sign. For example, if the answer is “1.234%”, **then enter it as “1.23”**)

A published solution is not available for this question yet.

Report a correction for Q391

Question 392 NAT · 2.0 marks

The Table-8 contains the details of 6 customers who have applied for a bike loan. Based on the two inputs (X1 & X2), the bank must decide whether to provide the bike loan or not. In addition, the actual decision on the loan is provided in the column (Y_act).
Source diagram or notation
A senior business analyst used logistic regression to compute the values in Table-9. Based on the data provided answer the given sub-questions.
Source diagram or notation
What is the sensitivity? (Note: Enter the answer in **“percentage rounded to two decimal places** without the percentage sign. For example, if the answer is “1.234%”, then **enter it as “1.23”**)

A published solution is not available for this question yet.

Report a correction for Q392

Question 393 NAT · 2.0 marks

The Table-8 contains the details of 6 customers who have applied for a bike loan. Based on the two inputs (X1 & X2), the bank must decide whether to provide the bike loan or not. In addition, the actual decision on the loan is provided in the column (Y_act).
Source diagram or notation
A senior business analyst used logistic regression to compute the values in Table-9. Based on the data provided answer the given sub-questions.
Source diagram or notation
What is the precision of class 0? (Note: Enter the answer in **“percentage rounded to two decimal** **places** without the percentage sign. For example, if the answer is “1.234%”, **then enter it as “1.23”**)

A published solution is not available for this question yet.

Report a correction for Q393

Question 394 NAT · 2.0 marks

The Table-8 contains the details of 6 customers who have applied for a bike loan. Based on the two inputs (X1 & X2), the bank must decide whether to provide the bike loan or not. In addition, the actual decision on the loan is provided in the column (Y_act).
Source diagram or notation
A senior business analyst used logistic regression to compute the values in Table-9. Based on the data provided answer the given sub-questions.
Source diagram or notation
What is the specificity? (Note: Enter the answer in **“percentage rounded to two decimal places** without the percentage sign. For example, if the answer is “1.234%”, **then enter it as “1.23”**)

A published solution is not available for this question yet.

Report a correction for Q394

Question 395 MSQ · 2.0 marks

If the attribute values in the conjoint analysis is a continuous variable and the data is collected in a pairwise order, then what approach can be used: (choose all that is applicable)
A.
Optimization approach
B.
Regression approach
C.
Statistical approach
D.
None of these

A published solution is not available for this question yet.

Report a correction for Q395

Question 396 MSQ · 2.0 marks

The part worth can be defined as: (choose all that is applicable)
A.
Level utilities
B.
The utility for that level of attribute
C.
Utility for separate parts of the products
D.
None of these

A published solution is not available for this question yet.

Report a correction for Q396

Question 397 MSQ · 2.0 marks

In Figure-2, the customer wants to decide between the products O1 & O2, and x denotes the coordinates of the ideal product. Which of the following are true? (choose all that is applicable)
Source diagram or notation
A.
Customers will prefer O1 when d2>d1
B.
Customers will prefer O2 when d1<d2
C.
None of these       **TDS** **Section Id :** 64065387645 **Section Number :** 15 **Section type :** Online **Mandatory or Optional :** Mandatory **Number of Questions :** 17 **Number of Questions to be attempted :** 17 **Section Marks :** 40 **Display Number Panel :** Yes **Section Negative Marks :** 0 **Group All Questions :** No **Enable Mark as Answered Mark for Review and** No **Clear Response :** **Section Maximum Duration :** 0 **Section Minimum Duration :** 0 **Section Time In :** Minutes **Maximum Instruction Time :** 0

A published solution is not available for this question yet.

Report a correction for Q397