Question 242 NAT · 2.0 marks

Which model produces an image more similar to the ground truth?

A published solution is not available for this question yet.

Report a correction for Q242

Question 244 MSQ · 1.0 marks

Which of the following Regression equations is/are MLR? (Choose all that is/are applicable)
A.Source diagram or notation
B.Source diagram or notation
C.Source diagram or notation
D.Source diagram or notation
E.Source diagram or notation
F.Source diagram or notation

A published solution is not available for this question yet.

Report a correction for Q244

Question 245 NAT · 1.0 marks

Given the confusion matrix in Table-1, answer the given subquestions
Source diagram or notation
What is the number of False Positives for Class-A?

A published solution is not available for this question yet.

Report a correction for Q245

Question 246 NAT · 1.0 marks

Given the confusion matrix in Table-1, answer the given subquestions
Source diagram or notation
What is the precision for predicting Class-D? [Note: Enter your answer in **“PERCENTAGE”** rounded to two decimal places without the percentage symbol. For example, if your answer is 1.235% then enter the answer as “1.24”]

A published solution is not available for this question yet.

Report a correction for Q246

Question 247 NAT · 1.0 marks

Given the confusion matrix in Table-1, answer the given subquestions
Source diagram or notation
What is the recall for predicting Class-B? [Note: Enter your answer in **“PERCENTAGE”** rounded to two decimal places without the percentage symbol. For example, if your answer is 1.235% then enter the answer as “1.24”]

A published solution is not available for this question yet.

Report a correction for Q247

Question 248 NAT · 1.0 marks

Given the confusion matrix in Table-1, answer the given subquestions
Source diagram or notation
What is the accuracy of the model? [Note: Enter your answer in **“PERCENTAGE”** rounded to two decimal places without the percentage symbol. For example, if your answer is 1.235% then enter the answer as “1.24”]

A published solution is not available for this question yet.

Report a correction for Q248

Question 249 NAT · 2.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** A manufacturer produces lenses for sunglasses. In a given day, a total of 100 products were produced. Products produced usually can have scratches. The manufacturer is interested to see if the length of the scratches on produced lenses is normally distributed. Hence, based on the production of 100 lenses, he has identified the length of scratch on each lens and the grouped data is presented to you in Table-2. Further, from sample, the manufacturer has computed the standard deviation to be 1.00. Based on the production lot of 100 units (given sample), you are asked to check if the “Length of Scratches on produced lenses” follows a Normal Distribution. Given this information, answer the given subquestions.
Source diagram or notation
What would be the mean of the distribution, if you want to check the hypothesis “The length of scratches on a produced lens follows a Normal Distribution”? [Note: Enter your answer rounded to two decimal places. For example, if your answer is 1.235 then enter the answer as “1.24”]

A published solution is not available for this question yet.

Report a correction for Q249

Question 250 NAT · 1.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** A manufacturer produces lenses for sunglasses. In a given day, a total of 100 products were produced. Products produced usually can have scratches. The manufacturer is interested to see if the length of the scratches on produced lenses is normally distributed. Hence, based on the production of 100 lenses, he has identified the length of scratch on each lens and the grouped data is presented to you in Table-2. Further, from sample, the manufacturer has computed the standard deviation to be 1.00. Based on the production lot of 100 units (given sample), you are asked to check if the “Length of Scratches on produced lenses” follows a Normal Distribution. Given this information, answer the given subquestions.
Source diagram or notation
How many (count) of degrees of freedom will be presented for the computed test statistic for this problem if you want to check the hypothesis “The length of scratches on a produced lens follows a Normal Distribution”?

A published solution is not available for this question yet.

Report a correction for Q250

Question 251 NAT · 2.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** A manufacturer produces lenses for sunglasses. In a given day, a total of 100 products were produced. Products produced usually can have scratches. The manufacturer is interested to see if the length of the scratches on produced lenses is normally distributed. Hence, based on the production of 100 lenses, he has identified the length of scratch on each lens and the grouped data is presented to you in Table-2. Further, from sample, the manufacturer has computed the standard deviation to be 1.00. Based on the production lot of 100 units (given sample), you are asked to check if the “Length of Scratches on produced lenses” follows a Normal Distribution. Given this information, answer the given subquestions.
Source diagram or notation
What would be expected frequency in the last bin of the frequency table (Hint: The frequency table is obtained by only modifying Table-2 without adding any new bins)? [Note: Enter your answer rounded to two decimal places. For example, if your answer is 1.235 then enter the answer as “1.24”]

A published solution is not available for this question yet.

Report a correction for Q251

Question 252 MSQ · 1.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** A manufacturer produces lenses for sunglasses. In a given day, a total of 100 products were produced. Products produced usually can have scratches. The manufacturer is interested to see if the length of the scratches on produced lenses is normally distributed. Hence, based on the production of 100 lenses, he has identified the length of scratch on each lens and the grouped data is presented to you in Table-2. Further, from sample, the manufacturer has computed the standard deviation to be 1.00. Based on the production lot of 100 units (given sample), you are asked to check if the “Length of Scratches on produced lenses” follows a Normal Distribution. Given this information, answer the given subquestions.
Source diagram or notation
Say the computed test statistic for the test is 12.3. Then, using Figure-2, at a significance level of 10% what will be concluded (choose all that are correct)?
Source diagram or notation
A.
Reject the Null Hypothesis
B.
Do not Reject the Null Hypothesis
C.
Reject the Alternative Hypothesis
D.
Do not Reject the Alternative Hypothesis
E.
Accept the Null Hypothesis
F.
Accept the Alternative Hypothesis

A published solution is not available for this question yet.

Report a correction for Q252

Question 253 NAT · 2.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** Table-2 provides the Cumulative Television Rating Points (CTRP), money spend on promotion (in Lakhs, denoted by “P”), and the advertisement revenue (in Lakhs, denoted by “R”) generated over a one-month period for 8 different television programs. The Revenue a TV show makes is the Dependent Variable. Using this data, answer the given subquestions.
Source diagram or notation
What is the total variability in the dependent variable? [Note: Enter your answer in decimal rounded to two decimal places. For example, if your answer is 1.235 then enter the answer as “1.24”]

A published solution is not available for this question yet.

Report a correction for Q253

Question 254 NAT · 1.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** Table-2 provides the Cumulative Television Rating Points (CTRP), money spend on promotion (in Lakhs, denoted by “P”), and the advertisement revenue (in Lakhs, denoted by “R”) generated over a one-month period for 8 different television programs. The Revenue a TV show makes is the Dependent Variable. Using this data, answer the given subquestions.
Source diagram or notation
The correlation coefficient between “CTRP” and “P” is 0.19. Then, what will be the Adjusted R- Square for the model (built using data in Table-2), where “CTRP” is the response variable and “P” is the predictor? [Note: Enter your answer in decimal rounded to two decimal places. For example, if your answer is 1.235 then enter the answer as “1.24”]

A published solution is not available for this question yet.

Report a correction for Q254

Question 255 NAT · 2.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** Table-2 provides the Cumulative Television Rating Points (CTRP), money spend on promotion (in Lakhs, denoted by “P”), and the advertisement revenue (in Lakhs, denoted by “R”) generated over a one-month period for 8 different television programs. The Revenue a TV show makes is the Dependent Variable. Using this data, answer the given subquestions.
Source diagram or notationSource diagram or notation

A published solution is not available for this question yet.

Report a correction for Q255

Question 256 NAT · 1.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** Milo The Goofball (MTG) is a company that makes footballs for “Recreation (R)” games and “Professional (P)” games. The process of making a football involves the following three stages Stage-1: Cutting and Dyeing Stage-2: Sewing Stage-3: Inspection It is seen that making a R-game football requires 6 minutes in Stage-1, 15 minutes in Stage-2 and 6 minutes in Stage-3. On the other hand, the football for a P-game requires 12 minutes, 9 minutes and 6 minutes in Stages 1,2 and 3 respectively. For the coming planning period of 4 weeks, MTG has 340 hours available in Stage-1, 480 hours available in Stage-2 and 300 hours available in Stage-3. Moreover, if required, MTG can avail more hours in Stage-1 at an additional cost of Rs. 200 per hour. Moreover, a R-game football generates a profit of Rs. 500 per piece and a P-game football generates a profit of Rs. 800 per piece. Furthermore, MTG has forecasted that the maximum number of footballs it can sell is 3000. With an objective to maximize the profit, formulate the problem as a Linear Program and answer the given subquestions.
How many decision variables are present in the standard form of the primal linear Programming Problem?

A published solution is not available for this question yet.

Report a correction for Q256

Question 257 NAT · 1.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** Milo The Goofball (MTG) is a company that makes footballs for “Recreation (R)” games and “Professional (P)” games. The process of making a football involves the following three stages Stage-1: Cutting and Dyeing Stage-2: Sewing Stage-3: Inspection It is seen that making a R-game football requires 6 minutes in Stage-1, 15 minutes in Stage-2 and 6 minutes in Stage-3. On the other hand, the football for a P-game requires 12 minutes, 9 minutes and 6 minutes in Stages 1,2 and 3 respectively. For the coming planning period of 4 weeks, MTG has 340 hours available in Stage-1, 480 hours available in Stage-2 and 300 hours available in Stage-3. Moreover, if required, MTG can avail more hours in Stage-1 at an additional cost of Rs. 200 per hour. Moreover, a R-game football generates a profit of Rs. 500 per piece and a P-game football generates a profit of Rs. 800 per piece. Furthermore, MTG has forecasted that the maximum number of footballs it can sell is 3000. With an objective to maximize the profit, formulate the problem as a Linear Program and answer the given subquestions.
How many decision variables are present in the Dual Linear Programming Problem (which is developed based on the standard form of the problem)?

A published solution is not available for this question yet.

Report a correction for Q257

Question 258 NAT · 1.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** Milo The Goofball (MTG) is a company that makes footballs for “Recreation (R)” games and “Professional (P)” games. The process of making a football involves the following three stages Stage-1: Cutting and Dyeing Stage-2: Sewing Stage-3: Inspection It is seen that making a R-game football requires 6 minutes in Stage-1, 15 minutes in Stage-2 and 6 minutes in Stage-3. On the other hand, the football for a P-game requires 12 minutes, 9 minutes and 6 minutes in Stages 1,2 and 3 respectively. For the coming planning period of 4 weeks, MTG has 340 hours available in Stage-1, 480 hours available in Stage-2 and 300 hours available in Stage-3. Moreover, if required, MTG can avail more hours in Stage-1 at an additional cost of Rs. 200 per hour. Moreover, a R-game football generates a profit of Rs. 500 per piece and a P-game football generates a profit of Rs. 800 per piece. Furthermore, MTG has forecasted that the maximum number of footballs it can sell is 3000. With an objective to maximize the profit, formulate the problem as a Linear Program and answer the given subquestions.
If the company decides to make 1500 P-game footballs, 1000 R-game footballs, then how many decision variables in the Dual Linear Programming Problem (which is developed based on the standard form of the problem) will have a value of “0”?

A published solution is not available for this question yet.

Report a correction for Q258

Question 259 NAT · 1.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** Milo The Goofball (MTG) is a company that makes footballs for “Recreation (R)” games and “Professional (P)” games. The process of making a football involves the following three stages Stage-1: Cutting and Dyeing Stage-2: Sewing Stage-3: Inspection It is seen that making a R-game football requires 6 minutes in Stage-1, 15 minutes in Stage-2 and 6 minutes in Stage-3. On the other hand, the football for a P-game requires 12 minutes, 9 minutes and 6 minutes in Stages 1,2 and 3 respectively. For the coming planning period of 4 weeks, MTG has 340 hours available in Stage-1, 480 hours available in Stage-2 and 300 hours available in Stage-3. Moreover, if required, MTG can avail more hours in Stage-1 at an additional cost of Rs. 200 per hour. Moreover, a R-game football generates a profit of Rs. 500 per piece and a P-game football generates a profit of Rs. 800 per piece. Furthermore, MTG has forecasted that the maximum number of footballs it can sell is 3000. With an objective to maximize the profit, formulate the problem as a Linear Program and answer the given subquestions.
If the company decides to make 1500 P-game footballs, 1000 R-game footballs, then what is the objective function value for the primal linear programming problem (which is in the standard form)? [Note: Enter your answer rounded to two decimal places. For example, if your answer is 1.235 then enter the answer as “1.24”]

A published solution is not available for this question yet.

Report a correction for Q259

Question 260 MSQ · 1.0 marks

**The Following Comprehension and Related Subquestions are Purely Hypothetical** Milo The Goofball (MTG) is a company that makes footballs for “Recreation (R)” games and “Professional (P)” games. The process of making a football involves the following three stages Stage-1: Cutting and Dyeing Stage-2: Sewing Stage-3: Inspection It is seen that making a R-game football requires 6 minutes in Stage-1, 15 minutes in Stage-2 and 6 minutes in Stage-3. On the other hand, the football for a P-game requires 12 minutes, 9 minutes and 6 minutes in Stages 1,2 and 3 respectively. For the coming planning period of 4 weeks, MTG has 340 hours available in Stage-1, 480 hours available in Stage-2 and 300 hours available in Stage-3. Moreover, if required, MTG can avail more hours in Stage-1 at an additional cost of Rs. 200 per hour. Moreover, a R-game football generates a profit of Rs. 500 per piece and a P-game football generates a profit of Rs. 800 per piece. Furthermore, MTG has forecasted that the maximum number of footballs it can sell is 3000. With an objective to maximize the profit, formulate the problem as a Linear Program and answer the given subquestions.
If the MTG decides to make 1500 P-game footballs, 1000 R-game footballs, then which of the following options is/are correct
A.
MTG will purchase addition capacity in Stage-1
B.
MTG will not purchase addition capacity in Stage-1
C.
MTG will have excess capacity in Stage-1
D.
MTG will have excess capacity in Stage-2
E.
MTG will have excess capacity in Stage-3
F.
MTG will have deficit capacity in Stage-2
G.
MTG will have deficit capacity in Stage-3
H.
MTG cannot make 1500 P-game footballs and 100 R-game footballs as it is an infeasible solution
I.
Cannot say as more information is required

A published solution is not available for this question yet.

Report a correction for Q260

Question 261 MSQ · 1.5 marks

Assume that you have trained a logistic regression model on a training dataset containing features X1 and X2. The coefficients obtained are given in Table 1.
Source diagram or notation
Based on the above data, answer the given subquestions.
What is the correct interpretation of the coefficient β1?
A.
If the X1 increases by 1 unit, the log of odds of the positive outcome increases by 0.3, assuming X2 to be constant.
B.
If the X1 increases by 1 unit, the odds of the positive outcome increases by 35% (e\(^{0.3}\) = 1.35), assuming X2 to be constant.
C.
Higher values of X1 are associated with an increased likelihood of the positive outcome
D.
None of these

A published solution is not available for this question yet.

Report a correction for Q261

Question 262 MSQ · 1.5 marks

Assume that you have trained a logistic regression model on a training dataset containing features X1 and X2. The coefficients obtained are given in Table 1.
Source diagram or notation
Based on the above data, answer the given subquestions.
What is the correct interpretation of the coefficient β2?
A.Source diagram or notation
B.Source diagram or notation
C.Source diagram or notation
D.Source diagram or notation

A published solution is not available for this question yet.

Report a correction for Q262

Question 263 MCQ · 1.5 marks

Assume that you are working on a classification problem where you are predicting whether the patient is suffering from cancer or not. As a business analyst, select the metric that is most appropriate.
A.
Precision
B.
Recall
C.
R2
D.
MAPE
E.
All of these

A published solution is not available for this question yet.

Report a correction for Q263

Question 264 MCQ · 1.5 marks

Assume that you are working on a classification problem where you are predicting whether the email is spam or not. As a business analyst, select the metric that is most appropriate.
A.
Precision
B.
Recall
C.
R2
D.
MAPE
E.
All of these

A published solution is not available for this question yet.

Report a correction for Q264

Question 265 NAT · 2.0 marks

There are six business units. There are two outputs and one input under consideration. You are solving the optimization problem for business unit 3, and you find that the efficiency is 0.8. You see that the dual variables corresponding to the constraints of business units 2 and 5 are non- zero, and the dual variables corresponding to the constraints of other units are zero. The dual variables corresponding to the constraints of business units 2 and 5 are 0.55 and 0.25, respectively. Based on Table 4, answers the given subquestions. Hint: At every step, round off your answers to 4 decimal places.
Source diagram or notation
How much will the Output 1 in HCU 3? [Note: Enter your answer in decimal rounded to four decimal places. For example, if your answer is 1000.63545, then enter the answer as “1000.6355”]

A published solution is not available for this question yet.

Report a correction for Q265

Question 266 NAT · 2.0 marks

There are six business units. There are two outputs and one input under consideration. You are solving the optimization problem for business unit 3, and you find that the efficiency is 0.8. You see that the dual variables corresponding to the constraints of business units 2 and 5 are non- zero, and the dual variables corresponding to the constraints of other units are zero. The dual variables corresponding to the constraints of business units 2 and 5 are 0.55 and 0.25, respectively. Based on Table 4, answers the given subquestions. Hint: At every step, round off your answers to 4 decimal places.
Source diagram or notation
How much will the Output 2 in HCU 3? [Note: Enter your answer in decimal rounded to four decimal places. For example, if your answer is 1000.63545, then enter the answer as “1000.6355”]

A published solution is not available for this question yet.

Report a correction for Q266

Question 267 MCQ · 2.0 marks

We are interested in understanding the efficiency of 5 Sales Offices. Each of the Sales Offices has an approved budget and a team size for achieving a fixed target of 10,00,000. As a Business Analyst, you must formulate a DEA problem using Linear programming for the **Sales Office 3**. Answer the given subquestions using the Table below.
Source diagram or notation
What is the objective function?
A.Source diagram or notation
B.Source diagram or notation
C.Source diagram or notation
D.Source diagram or notation
E.Source diagram or notation

A published solution is not available for this question yet.

Report a correction for Q267

Question 268 MCQ · 2.0 marks

We are interested in understanding the efficiency of 5 Sales Offices. Each of the Sales Offices has an approved budget and a team size for achieving a fixed target of 10,00,000. As a Business Analyst, you must formulate a DEA problem using Linear programming for the **Sales Office 3**. Answer the given subquestions using the Table below.
Source diagram or notation
What is the type constraint?
A.Source diagram or notation
B.Source diagram or notation
C.Source diagram or notation
D.Source diagram or notation

A published solution is not available for this question yet.

Report a correction for Q268

Question 269 MCQ · 2.0 marks

We are interested in understanding the efficiency of 5 Sales Offices. Each of the Sales Offices has an approved budget and a team size for achieving a fixed target of 10,00,000. As a Business Analyst, you must formulate a DEA problem using Linear programming for the **Sales Office 3**. Answer the given subquestions using the Table below.
Source diagram or notation
Which of them is not a constraint for the LP problem pertaining to Sales Office 3?
A.Source diagram or notation
B.Source diagram or notation
C.Source diagram or notation
D.Source diagram or notation
E.Source diagram or notation
F.Source diagram or notation

A published solution is not available for this question yet.

Report a correction for Q269

Question 270 NAT · 2.0 marks

You are in the process of selecting an ideal Laptop when a lot of options are available. For example, the three brands that have been on top of your mind are Acer, HP, and Dell. Similarly, there are 2 RAM options available: 8 GB and 16 GB. Lastly, the processor is another important variable in deciding the ideal laptop. There are 3 processors available: i3, i5, and i7. Also, assume that Acer is the least preferred brand. Based on the inputs available, you build a regression model, and the coefficients are given below in Figure 1.
Source diagram or notation
Based on the above data, answer the given subquestions.
What is the part worth to customers if he/she upgrades from an i3 to an i7 processor? [Note: Enter your answer in decimal rounded to four decimal places. For example, if your answer is 1000.63545, then enter the answer as “1000.6355”]

A published solution is not available for this question yet.

Report a correction for Q270

Question 271 NAT · 2.0 marks

You are in the process of selecting an ideal Laptop when a lot of options are available. For example, the three brands that have been on top of your mind are Acer, HP, and Dell. Similarly, there are 2 RAM options available: 8 GB and 16 GB. Lastly, the processor is another important variable in deciding the ideal laptop. There are 3 processors available: i3, i5, and i7. Also, assume that Acer is the least preferred brand. Based on the inputs available, you build a regression model, and the coefficients are given below in Figure 1.
Source diagram or notation
Based on the above data, answer the given subquestions.
How much is the weightage provided by the customer for the Brand? [Note: Enter your answer in decimal rounded to four decimal places. For example, if your answer is 0.63545, then enter the answer as “63.55”]

A published solution is not available for this question yet.

Report a correction for Q271

Question 272 NAT · 2.0 marks

You are in the process of selecting an ideal Laptop when a lot of options are available. For example, the three brands that have been on top of your mind are Acer, HP, and Dell. Similarly, there are 2 RAM options available: 8 GB and 16 GB. Lastly, the processor is another important variable in deciding the ideal laptop. There are 3 processors available: i3, i5, and i7. Also, assume that Acer is the least preferred brand. Based on the inputs available, you build a regression model, and the coefficients are given below in Figure 1.
Source diagram or notation
Based on the above data, answer the given subquestions.
How much is the weightage provided by the customer for the RAM? [Note: Enter your answer in decimal rounded to four decimal places. For example, if your answer is 0.63545, then enter the answer as “63.55”]

A published solution is not available for this question yet.

Report a correction for Q272

Question 273 NAT · 2.0 marks

You are in the process of selecting an ideal Laptop when a lot of options are available. For example, the three brands that have been on top of your mind are Acer, HP, and Dell. Similarly, there are 2 RAM options available: 8 GB and 16 GB. Lastly, the processor is another important variable in deciding the ideal laptop. There are 3 processors available: i3, i5, and i7. Also, assume that Acer is the least preferred brand. Based on the inputs available, you build a regression model, and the coefficients are given below in Figure 1.
Source diagram or notation
Based on the above data, answer the given subquestions.
How much is the weightage provided by the customer for the processor? [Note: Enter your answer in decimal rounded to four decimal places. For example, if your answer is 0.63545, then enter the answer as “63.55”]

A published solution is not available for this question yet.

Report a correction for Q273