MauryaHub PYQ Practice

Statistics for Data Science II · End Term · Sep 2025 · AN

Statistics for Data Science II · End Term · Sep 2025 AN

← Course papers · Start practice / exam

Questions and published explanations below are available without starting a test. Some questions may not have a published solution yet.

21 / 21 published solutions

Question 2 MCQ · 0.0 marks

Source diagram or notation
1. Markov’s inequality: Let X be a discrete random variable taking non-negative values with a finite mean ju. Then, PIX >< 1 2. Chebyshev’s inequality: Let X be a discrete random variable with a finite mean ju and a finite variance o”. Then, PX-p [2 ho) <5 3, Weak Law of Large numbers: Let X;,Xo,...,Xn iid X with E[X] = p, Var(X) = Define sample mean X = a ately Then, n a P(X pl>8)< =n 4, Using CLT to approximate probability: Let X1,Xo,...,Xq~ iid X with B[X] = 1, Var(X) =i Define Y = X, + Xq+...+Xq. Then, Y-mp yno 5. Bias of an estimator: Bias(6,) = E(6) - 8 re Normal((), 1). 6. Method of moments: Sample moments, M,(X,, Xp,..., Xn) = Ue xe Niel Procedure: For one parameter 4 ¢ Sample moment: my ¢ Distribution moment: E(X) = f(@) ¢ Solve for 6 from f(6) = my in terms of my. eb: replace m; by M; in the above solution. 10. dts Likelihood of i.i.d. samples: Likelihood of a sampling xy, x9,..., In, denoted n L(a1,...,2n) =[] fx(ais1,,...) i=l Maximum likelihood (ML) estimation: n 9},05,... = arg max fx (i591, 02, .-.) 5,85... rcs Bayesian estimation: Let X;,..., X, ~ i.i.d.X, parameter 0. Prior distribution of 8 : @ ~ fe(4). Samples, S$ : (X, =21,..., X=.) Posterior: 9 | (X; =21,..., X= 15) Bayes’ rule: Posterior x Prior x Likelihood Posterior density x fo(0) x P(X; = 1,...,Xn = 2, | O =) Normal samples with unknown mean and known variance: a Xn ~ iid. Normal(M,o?). Prior M ~ Normal(, 08). 2 2 =[ ng o Posterior mean: ji = X | ——2— } + — ie (= aay, SHE Hypothesis Testing e Test for mean Case (1): When population variance c” is known (2-test) Test Ho Ha Test statistic | Rejection region Lx right-tailed | pp = po | u > po ie X- 0 X>c ~ hfe SK left-tailed | p= po | up < Ho X-—M x <i _ yi = two-tailed |p=po} HAH) , X—-p [X — pol > _ a Case (2): When population variance o 2 is unknown (t-test) Test Ho Hy Test statistic | Rejection region T=¥ right-tailed | ju = pig | pe > plo X-m X>c tra = SG T=X left-tailed | j= yo | pe < joo ; X-w X<c eae 7 ie two-tailed | p= po | pF po X-w| X-ml>e thi = Ta \?-test for variance: Test Ho Hy Test statistic Rejection region . . —1)s? right-tailed | ¢ = 09 | 7 > 09 ro x wey Soe % _1)82 ummm \oeas exes le oad ney Sed % _1)92 8? > 2 where = = P(S? > 2) or twotailed |o=o| oo |7=2—F a |" NB ee % S? < c where z= P(S* < c’) ¢ Two samples z-test for means: Test Hy Hy Test statistic Rejection region T=X-Y 2 2 A= a Tight-tailed | jax = pa | o > Ha X-Yo Nomal(0 eet, 2) if Hp is true MNS mn T=¥-X _ _ leftctailed J j= ya] 14 <4 7X Norma a.) if Ho is true Y-X>e nm T=X-Y S. wh _ twortailed | un = pa | on # Ha X-Ywo Nonmal(0 ons 2) if Ho is true [X-¥|>e mm
Source diagram or notation
6406536030549.
Useful Data has been mentioned above.
6406536030550.
This data attachment is just for a reference & not for an evaluation.

Published solution

**1. Review the reference sheet:** Question 2 provides the official formula and table reference sheet ("Useful data") for the Statistics for Data Science II examination. Selecting **"Useful Data has been mentioned above."** acknowledges the reference sheet. **Answer: Option A** A: **Correct:** This option confirms and acknowledges the useful data and formulas provided above. B: **Incorrect:** Standard exam instructions require selecting the first option to acknowledge the formula sheet.

Report a correction for Q2

Question 3 NAT · 3.0 marks

A supermarket manager claims that the average billing time for customers is 12 minutes with a known standard deviation of 3.5 minutes. To verify this claim, a random sample of 49 customers was studied, showing an average billing time of 12.9 minutes. Let the null and alternative hypothesis be:
Source diagram or notation
;
Source diagram or notation
. Find the P-value. Enter the answer correct to two decimal places.

Published solution

**1. Identify the given values and hypotheses:** - Null hypothesis: $H_0: \mu = 12$ - Alternative hypothesis: $H_A: \mu > 12$ (right-tailed test) - Population standard deviation (known): $\sigma = 3.5\text{ minutes}$ - Sample size: $n = 49$ - Observed sample mean: $\bar{x} = 12.9\text{ minutes}$ **2. Compute the $z$-test statistic:** $$z = \frac{\bar{x} - \mu_0}{\sigma / \sqrt{n}} = \frac{12.9 - 12}{3.5 / \sqrt{49}} = \frac{0.9}{3.5 / 7} = \frac{0.9}{0.5} = 1.8$$ **3. Find the $P$-value for the right-tailed test:** From the "Useful data" table in Question 2, $F_Z(1.8) = P(Z \le 1.8) = 0.9641$. Therefore, the $P$-value is: $$\text{P-value} = P(Z > 1.8) = 1 - F_Z(1.8) = 1 - 0.9641 = 0.0359 \approx 0.04$$ **Answer: 0.04**

Report a correction for Q3

Question 4 MCQ · 3.0 marks

Consider the samples {1, 3, 4, 6, 2} taken from a Poisson Distribution with an unknown parameter
Source diagram or notation
. Using a Gamma(5, 8) prior, find the posterior distribution of
Source diagram or notation
.
6406536030552.
Gamma
Source diagram or notation
6406536030553.
Gamma
Source diagram or notation
6406536030554.
Gamma
Source diagram or notation
6406536030555.
Gamma
Source diagram or notation

Published solution

**1. Recall the Gamma-Poisson conjugate prior relationship:** Let $X_1, \dots, X_n \sim \text{i.i.d. Poisson}(\lambda)$ and let the prior distribution of $\lambda$ be $\text{Gamma}(\alpha, \beta)$ with density: $$f(\lambda) = \frac{\beta^\alpha}{\Gamma(\alpha)} \lambda^{\alpha - 1} e^{-\beta \lambda}$$ The likelihood of observing samples $x_1, \dots, x_n$ is: $$L(\lambda) = \prod_{i=1}^n \frac{e^{-\lambda} \lambda^{x_i}}{x_i!} \propto \lambda^{\sum_{i=1}^n x_i} e^{-n\lambda}$$ **2. Multiply prior and likelihood to find the posterior:** $$f(\lambda \mid x_1, \dots, x_n) \propto \lambda^{\alpha - 1 + \sum x_i} e^{-(\beta + n)\lambda}$$ Thus, the posterior distribution is $\text{Gamma}\left(\alpha + \sum_{i=1}^n x_i,\; \beta + n\right)$. **3. Substitute the given values:** - Prior: $\alpha = 5$, $\beta = 8$ - Sample: $\{1, 3, 4, 6, 2\}$, so $n = 5$ and $\sum_{i=1}^5 x_i = 1 + 3 + 4 + 6 + 2 = 16$. - Posterior parameters: $$\alpha_{\text{post}} = 5 + 16 = 21, \qquad \beta_{\text{post}} = 8 + 5 = 13$$ Hence, the posterior distribution is **$\text{Gamma}(21, 13)$**. **Answer: Option D** A: **Incorrect:** $\alpha_{\text{post}} = 5 + 16 = 21$, not $20$. B: **Incorrect:** This swaps the shape and rate parameters and uses $20$ instead of $21$. C: **Incorrect:** This swaps the shape parameter ($21$) and rate parameter ($13$). D: **Correct:** Adding $\sum x_i = 16$ to $\alpha = 5$ gives $21$, and adding $n = 5$ to $\beta = 8$ gives $13$, yielding $\text{Gamma}(21, 13)$.

Report a correction for Q4

Question 5 MCQ · 3.0 marks

The joint probability density function of two continuous random variables
Source diagram or notation
and
Source diagram or notation
is given as,
Source diagram or notation
Find the marginal density of
Source diagram or notation
.
6406536030556.Source diagram or notation
6406536030557.Source diagram or notation
6406536030558.Source diagram or notation
6406536030559.Source diagram or notation

Published solution

**1. Identify the joint PDF and its support:** The joint density of $X$ and $Y$ is: $$f(x, y) = \begin{cases} 12y^2, & 0 \le y \le x \le 1, \\ 0, & \text{otherwise.} \end{cases}$$ **2. Integrate over $x$ to find the marginal density $f_Y(y)$:** For a fixed $y \in [0, 1]$, the condition $0 \le y \le x \le 1$ means $x$ ranges from $y$ to $1$: $$f_Y(y) = \int_{y}^{1} 12y^2 \, dx = 12y^2 [x]_{x=y}^{x=1} = 12y^2(1 - y), \quad 0 \le y \le 1$$ and $f_Y(y) = 0$ otherwise. **Answer: Option B** A: **Incorrect:** The integrand is $12y^2$, not $12y$, so the factor $y^2$ remains after integrating with respect to $x$. B: **Correct:** Integrating $12y^2$ with respect to $x$ from $x = y$ to $x = 1$ yields $f_Y(y) = 12y^2(1 - y)$ for $0 \le y \le 1$. C: **Incorrect:** The marginal density of $Y$ cannot depend on the dummy variable $x$ in its support ($0 \le y \le 1$, not $0 \le y \le x$). D: **Incorrect:** Both the expression $12y$ and the support $y \le x \le 1$ are incorrect.

Report a correction for Q5

Question 6 NAT · 0.5 marks

Let
Source diagram or notation
be a discrete random variable with the probability mass function
Source diagram or notation
where
Source diagram or notation
is an unknown parameter. Let
Source diagram or notation
be an estimator of
Source diagram or notation
from
Source diagram or notation
i.i.d
Source diagram or notation
, given as
Source diagram or notation
Check whether
Source diagram or notation
is an unbiased estimator of
Source diagram or notation
, otherwise find an unbiased estimator of
Source diagram or notation
. **Solution:** Since we know that
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
if
Source diagram or notation
. Now,
Source diagram or notation
Now, the values of
Source diagram or notation
and
Source diagram or notation
can be calculated as
Source diagram or notation
Source diagram or notation
Now, substituting the values in equation(1), we get
Source diagram or notation
Hence, from equation(2) we can conclude that
Source diagram or notation
is an
Source diagram or notation
estimator of
Source diagram or notation
. Also,
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
. Consider the following options for the blanks.
Source diagram or notation
Answer the given sub-questions. **Note:** Enter only the correct option number (e.g. 8) without any brackets or punctuation.
Enter the correct option number for
Source diagram or notation
.

Published solution

**1. Identify the condition for an unbiased estimator (Blank A):** By definition, an estimator $T$ is an unbiased estimator of a parameter $\theta$ if its expected value equals $\theta$: $$E(T) = \theta$$ **2. Match with the numbered options list:** In the given options list, **$E(T) = \theta$** is option **(5)**. **Answer: 5**

Report a correction for Q6

Question 7 NAT · 0.5 marks

Let
Source diagram or notation
be a discrete random variable with the probability mass function
Source diagram or notation
where
Source diagram or notation
is an unknown parameter. Let
Source diagram or notation
be an estimator of
Source diagram or notation
from
Source diagram or notation
i.i.d
Source diagram or notation
, given as
Source diagram or notation
Check whether
Source diagram or notation
is an unbiased estimator of
Source diagram or notation
, otherwise find an unbiased estimator of
Source diagram or notation
. **Solution:** Since we know that
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
if
Source diagram or notation
. Now,
Source diagram or notation
Now, the values of
Source diagram or notation
and
Source diagram or notation
can be calculated as
Source diagram or notation
Source diagram or notation
Now, substituting the values in equation(1), we get
Source diagram or notation
Hence, from equation(2) we can conclude that
Source diagram or notation
is an
Source diagram or notation
estimator of
Source diagram or notation
. Also,
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
. Consider the following options for the blanks.
Source diagram or notation
Answer the given sub-questions. **Note:** Enter only the correct option number (e.g. 8) without any brackets or punctuation.
Enter the correct option number for
Source diagram or notation
.

Published solution

**1. Compute $E(X_1^2)$ (Blank B):** Since $X_1 \sim X$ has PMF $P(X = 0) = \theta$, $P(X = 1) = 2\theta$, and $P(X = 2) = 1 - 3\theta$: $$E(X_1^2) = 0^2 \cdot \theta + 1^2 \cdot (2\theta) + 2^2 \cdot (1 - 3\theta) = 2\theta + 4 - 12\theta = 4 - 10\theta$$ **2. Match with the numbered options list:** In the options list, **$4 - 10\theta$** is option **(2)**. **Answer: 2**

Report a correction for Q7

Question 8 NAT · 0.5 marks

Let
Source diagram or notation
be a discrete random variable with the probability mass function
Source diagram or notation
where
Source diagram or notation
is an unknown parameter. Let
Source diagram or notation
be an estimator of
Source diagram or notation
from
Source diagram or notation
i.i.d
Source diagram or notation
, given as
Source diagram or notation
Check whether
Source diagram or notation
is an unbiased estimator of
Source diagram or notation
, otherwise find an unbiased estimator of
Source diagram or notation
. **Solution:** Since we know that
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
if
Source diagram or notation
. Now,
Source diagram or notation
Now, the values of
Source diagram or notation
and
Source diagram or notation
can be calculated as
Source diagram or notation
Source diagram or notation
Now, substituting the values in equation(1), we get
Source diagram or notation
Hence, from equation(2) we can conclude that
Source diagram or notation
is an
Source diagram or notation
estimator of
Source diagram or notation
. Also,
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
. Consider the following options for the blanks.
Source diagram or notation
Answer the given sub-questions. **Note:** Enter only the correct option number (e.g. 8) without any brackets or punctuation.
Enter the correct option number for
Source diagram or notation
.

Published solution

**1. Compute $E(X_2)$ (Blank C):** Since $X_2 \sim X$ has PMF $P(X = 0) = \theta$, $P(X = 1) = 2\theta$, and $P(X = 2) = 1 - 3\theta$: $$E(X_2) = 0 \cdot \theta + 1 \cdot (2\theta) + 2 \cdot (1 - 3\theta) = 2\theta + 2 - 6\theta = 2 - 4\theta$$ **2. Match with the numbered options list:** In the options list, **$2 - 4\theta$** is option **(6)**. **Answer: 6**

Report a correction for Q8

Question 9 NAT · 0.5 marks

Let
Source diagram or notation
be a discrete random variable with the probability mass function
Source diagram or notation
where
Source diagram or notation
is an unknown parameter. Let
Source diagram or notation
be an estimator of
Source diagram or notation
from
Source diagram or notation
i.i.d
Source diagram or notation
, given as
Source diagram or notation
Check whether
Source diagram or notation
is an unbiased estimator of
Source diagram or notation
, otherwise find an unbiased estimator of
Source diagram or notation
. **Solution:** Since we know that
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
if
Source diagram or notation
. Now,
Source diagram or notation
Now, the values of
Source diagram or notation
and
Source diagram or notation
can be calculated as
Source diagram or notation
Source diagram or notation
Now, substituting the values in equation(1), we get
Source diagram or notation
Hence, from equation(2) we can conclude that
Source diagram or notation
is an
Source diagram or notation
estimator of
Source diagram or notation
. Also,
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
. Consider the following options for the blanks.
Source diagram or notation
Answer the given sub-questions. **Note:** Enter only the correct option number (e.g. 8) without any brackets or punctuation.
Enter the correct option number for
Source diagram or notation
.

Published solution

**1. Substitute $E(X_1^2) = 4 - 10\theta$ and $E(X_2) = 2 - 4\theta$ into equation (1) for $E(T)$ (Blank D):** $$E(T) = \frac{E(X_1^2) - 5E(X_2) + 16}{10} = \frac{(4 - 10\theta) - 5(2 - 4\theta) + 16}{10}$$ Simplify the numerator: $$4 - 10\theta - 10 + 20\theta + 16 = 10\theta + 10$$ Divide by $10$: $$E(T) = \frac{10\theta + 10}{10} = \theta + 1$$ **2. Match with the numbered options list:** In the options list, **$\theta + 1$** is option **(8)**. **Answer: 8**

Report a correction for Q9

Question 10 NAT · 0.5 marks

Let
Source diagram or notation
be a discrete random variable with the probability mass function
Source diagram or notation
where
Source diagram or notation
is an unknown parameter. Let
Source diagram or notation
be an estimator of
Source diagram or notation
from
Source diagram or notation
i.i.d
Source diagram or notation
, given as
Source diagram or notation
Check whether
Source diagram or notation
is an unbiased estimator of
Source diagram or notation
, otherwise find an unbiased estimator of
Source diagram or notation
. **Solution:** Since we know that
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
if
Source diagram or notation
. Now,
Source diagram or notation
Now, the values of
Source diagram or notation
and
Source diagram or notation
can be calculated as
Source diagram or notation
Source diagram or notation
Now, substituting the values in equation(1), we get
Source diagram or notation
Hence, from equation(2) we can conclude that
Source diagram or notation
is an
Source diagram or notation
estimator of
Source diagram or notation
. Also,
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
. Consider the following options for the blanks.
Source diagram or notation
Answer the given sub-questions. **Note:** Enter only the correct option number (e.g. 8) without any brackets or punctuation.
Enter the correct option number for
Source diagram or notation
.

Published solution

**1. Determine whether $T$ is biased or unbiased (Blank E):** From equation (2), $E(T) = \theta + 1 \ne \theta$. Since the expected value of $T$ does not equal $\theta$, $T$ is a **biased** estimator of $\theta$. **2. Match with the numbered options list:** In the options list, **biased** is option **(10)**. **Answer: 10**

Report a correction for Q10

Question 11 NAT · 0.5 marks

Let
Source diagram or notation
be a discrete random variable with the probability mass function
Source diagram or notation
where
Source diagram or notation
is an unknown parameter. Let
Source diagram or notation
be an estimator of
Source diagram or notation
from
Source diagram or notation
i.i.d
Source diagram or notation
, given as
Source diagram or notation
Check whether
Source diagram or notation
is an unbiased estimator of
Source diagram or notation
, otherwise find an unbiased estimator of
Source diagram or notation
. **Solution:** Since we know that
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
if
Source diagram or notation
. Now,
Source diagram or notation
Now, the values of
Source diagram or notation
and
Source diagram or notation
can be calculated as
Source diagram or notation
Source diagram or notation
Now, substituting the values in equation(1), we get
Source diagram or notation
Hence, from equation(2) we can conclude that
Source diagram or notation
is an
Source diagram or notation
estimator of
Source diagram or notation
. Also,
Source diagram or notation
will be an unbiased estimator of
Source diagram or notation
. Consider the following options for the blanks.
Source diagram or notation
Answer the given sub-questions. **Note:** Enter only the correct option number (e.g. 8) without any brackets or punctuation.
Enter the correct option number for
Source diagram or notation
.

Published solution

**1. Construct an unbiased estimator from $T$ (Blank F):** Since $E(T) = \theta + 1$, by linearity of expectation: $$E(T - 1) = E(T) - 1 = (\theta + 1) - 1 = \theta$$ Therefore, **$T - 1$** is an unbiased estimator of $\theta$. **2. Match with the numbered options list:** In the options list, **$T - 1$** is option **(12)**. **Answer: 12**

Report a correction for Q11

Question 12 NAT · 3.0 marks

A nutrition company claims that the average protein content of its energy bars is 20 grams, with a known standard deviation of 4 grams. A sports academy suspects that the actual mean protein content may be less than 20 grams. To test the claim, the academy collects a random sample of 64 bars. The academy decides to reject the company’s claim if the mean protein content of the sample
Source diagram or notation
and accepts it otherwise. Assuming that the company’s claim is true, what is the probability that the academy rejects the claim?

Published solution

**1. Set up the sampling distribution under the company's claim ($H_0$):** - True mean under the claim: $\mu = 20\text{ grams}$ - Known population standard deviation: $\sigma = 4\text{ grams}$ - Sample size: $n = 64$ - Standard error of the sample mean $\bar{X}$: $$\sigma_{\bar{X}} = \frac{\sigma}{\sqrt{n}} = \frac{4}{\sqrt{64}} = \frac{4}{8} = 0.5$$ **2. Calculate the probability of rejecting the claim ($\bar{X} < 19.2$):** Standardize $\bar{X} = 19.2$: $$Z = \frac{19.2 - 20}{0.5} = \frac{-0.8}{0.5} = -1.6$$ Using the symmetry of the standard normal distribution and $F_Z(1.6) = 0.9452$ from the Useful Data table: $$P(\bar{X} < 19.2) = P(Z < -1.6) = 1 - F_Z(1.6) = 1 - 0.9452 = 0.0548 \approx 0.05$$ **Answer: 0.05**

Report a correction for Q12

Question 13 NAT · 2.0 marks

A laboratory is testing a new temperature sensor to check whether it provides more consistent readings than the old model. The lab records the temperature (in \(^{o}\)C) from 5 repeated measurements using the new sensor: 10, 8, 2, 5, 15 The old temperature sensor has a known standard deviation of
Source diagram or notation
. Based on the above data, answer the given subquestions.
Compute the sample variance of the 5 temperature readings from the new sensor. Enter the answer correct to one decimal place.

Published solution

**1. Compute the sample mean $\bar{x}$ of the $n = 5$ readings:** The temperature readings are $10, 8, 2, 5, 15$: $$\bar{x} = \frac{10 + 8 + 2 + 5 + 15}{5} = \frac{40}{5} = 8$$ **2. Compute the sample variance $s^2$:** $$s^2 = \frac{1}{n - 1} \sum_{i=1}^5 (x_i - \bar{x})^2 = \frac{(10 - 8)^2 + (8 - 8)^2 + (2 - 8)^2 + (5 - 8)^2 + (15 - 8)^2}{5 - 1}$$ $$s^2 = \frac{2^2 + 0^2 + (-6)^2 + (-3)^2 + 7^2}{4} = \frac{4 + 0 + 36 + 9 + 49}{4} = \frac{98}{4} = 24.5$$ **Answer: 24.5**

Report a correction for Q13

Question 14 MCQ · 3.0 marks

A laboratory is testing a new temperature sensor to check whether it provides more consistent readings than the old model. The lab records the temperature (in \(^{o}\)C) from 5 repeated measurements using the new sensor: 10, 8, 2, 5, 15 The old temperature sensor has a known standard deviation of
Source diagram or notation
. Based on the above data, answer the given subquestions.
At
Source diagram or notation
significance level, determine whether the new sensor has less variability than the old sensor.
6406536030568.
The new sensor does not show less variability than the old sensor.
6406536030569.
The new sensor has less variability than the old sensor.

Published solution

**1. Set up the hypotheses for the $\chi^2$-test for variance:** - Old sensor standard deviation: $\sigma_0 = 1^\circ\text{C} \implies \sigma_0^2 = 1$ - $H_0: \sigma^2 = 1$ vs. $H_A: \sigma^2 < 1$ (testing if the new sensor has *less* variability, left-tailed test) - Sample size: $n = 5$ (degrees of freedom $df = n - 1 = 4$) - Sample variance: $s^2 = 24.5$ **2. Compute the test statistic and compare with the critical value:** $$T = \frac{(n - 1)s^2}{\sigma_0^2} = \frac{4 \times 24.5}{1} = 98$$ For a left-tailed test at $\alpha = 0.05$ with $df = 4$, the rejection region is $T < F_{\chi_4^2}^{-1}(0.05) = 0.711$ (from Useful Data). Since $T = 98 \not< 0.711$ (in fact, the sample variance $24.5$ is much larger than $1$), we fail to reject $H_0$. **3. Conclude:** **The new sensor does not show less variability than the old sensor.** **Answer: Option A** A: **Correct:** Since the sample variance $s^2 = 24.5$ is much larger than $\sigma_0^2 = 1$ (test statistic $T = 98 > 0.711$), we do not reject $H_0$. B: **Incorrect:** To show less variability, the sample variance would need to be significantly smaller than $1$, whereas $s^2 = 24.5$.

Report a correction for Q14

Question 15 MCQ · 3.0 marks

A factory manufactures light bulbs, and each bulb has a probability
Source diagram or notation
of being defective. To estimate this probability using Bayesian methods, assume the prior distribution of
Source diagram or notation
to be Beta(3, 3). A quality inspector tests 12 independent bulbs. If 5 bulbs are found to be defective, answer the given subquestions.
Determine the posterior distribution of
Source diagram or notation
.
6406536030570.
Beta
Source diagram or notation
6406536030571.
Beta
Source diagram or notation
6406536030572.
Beta
Source diagram or notation
6406536030573.
Beta
Source diagram or notation

Published solution

**1. Recall the Beta-Binomial conjugate update:** If the prior distribution for the success/defective probability $p$ is $\text{Beta}(\alpha, \beta)$ and we observe $x$ defectives in $n$ independent Bernoulli trials, the posterior distribution of $p$ is: $$p \mid x \sim \text{Beta}(\alpha + x,\; \beta + n - x)$$ **2. Substitute the given values:** - Prior: $\text{Beta}(3, 3)$, so $\alpha = 3$ and $\beta = 3$. - Sample: $n = 12$ bulbs tested, $x = 5$ defective bulbs, and $n - x = 12 - 5 = 7$ non-defective bulbs. - Posterior parameters: $$\alpha_{\text{post}} = 3 + 5 = 8, \qquad \beta_{\text{post}} = 3 + 7 = 10$$ Thus, the posterior distribution is **$\text{Beta}(8, 10)$**. **Answer: Option D** A: **Incorrect:** This adds $4$ and $6$ instead of $x = 5$ defectives and $n - x = 7$ non-defectives. B: **Incorrect:** This swaps the number of defectives ($5$) and non-defectives ($7$). C: **Incorrect:** The prior is $\text{Beta}(3, 3)$, not $\text{Beta}(4, 0)$. D: **Correct:** Updating $\text{Beta}(3, 3)$ with $5$ defectives and $7$ non-defectives yields $\text{Beta}(3 + 5, 3 + 7) = \text{Beta}(8, 10)$.

Report a correction for Q15

Question 16 NAT · 2.0 marks

A factory manufactures light bulbs, and each bulb has a probability
Source diagram or notation
of being defective. To estimate this probability using Bayesian methods, assume the prior distribution of
Source diagram or notation
to be Beta(3, 3). A quality inspector tests 12 independent bulbs. If 5 bulbs are found to be defective, answer the given subquestions.
Using the posterior distribution, calculate the posterior mean of
Source diagram or notation
. Enter the answer correct to two decimal places.

Published solution

**1. Use the mean formula for a $\text{Beta}(\alpha, \beta)$ distribution:** From the Useful Data table, the mean of a $\text{Beta}(\alpha, \beta)$ random variable is: $$E[p] = \frac{\alpha}{\alpha + \beta}$$ **2. Substitute the posterior parameters $\alpha = 8$ and $\beta = 10$:** $$\text{Posterior mean} = \frac{8}{8 + 10} = \frac{8}{18} = \frac{4}{9} \approx 0.4444 \approx 0.44$$ **Answer: 0.44**

Report a correction for Q16

Question 17 NAT · 3.0 marks

The probability density function of a continuous random variable
Source diagram or notation
is given by
Source diagram or notation
Based on the above data, answer the given subquestions.
Let
Source diagram or notation
be the CDF of
Source diagram or notation
. Calculate the value of
Source diagram or notation
. Enter the answer correct to two decimal places.

Published solution

**1. Find the normalization constant $k$:** Since $f_X(x) = k(2 - x)$ for $0 < x < 2$ is a valid PDF, its integral over $(0, 2)$ must equal $1$: $$\int_0^2 k(2 - x)\,dx = k\left[2x - \frac{x^2}{2}\right]_0^2 = k(4 - 2) = 2k = 1 \implies k = \frac{1}{2}$$ **2. Compute $F_X(1) = P(X \le 1)$:** $$F_X(1) = \int_0^1 \frac{1}{2}(2 - x)\,dx = \frac{1}{2}\left[2x - \frac{x^2}{2}\right]_0^1 = \frac{1}{2}\left(2 - \frac{1}{2}\right) = \frac{1}{2} \cdot \frac{3}{2} = \frac{3}{4} = 0.75$$ **Answer: 0.75**

Report a correction for Q17

Question 18 MCQ · 2.0 marks

The probability density function of a continuous random variable
Source diagram or notation
is given by
Source diagram or notation
Based on the above data, answer the given subquestions.
Find the expected value of
Source diagram or notation
.
6406536030576.Source diagram or notation
6406536030577.Source diagram or notation
6406536030578.Source diagram or notation
6406536030579.
wl

Published solution

**1. Use the PDF $f_X(x) = \frac{1}{2}(2 - x)$ on $0 < x < 2$ to compute $E[X]$:** $$E[X] = \int_0^2 x \cdot \frac{1}{2}(2 - x)\,dx = \frac{1}{2} \int_0^2 (2x - x^2)\,dx$$ **2. Evaluate the definite integral:** $$E[X] = \frac{1}{2} \left[x^2 - \frac{x^3}{3}\right]_0^2 = \frac{1}{2} \left(4 - \frac{8}{3}\right) = \frac{1}{2} \cdot \frac{4}{3} = \frac{2}{3}$$ **Answer: Option D** A: **Incorrect:** $\frac{1}{2}$ is not the expected value; the density is higher near $x = 0$, pulling the mean to $\frac{2}{3}$. B: **Incorrect:** $\frac{4}{3}$ is the value of the integral before multiplying by $k = \frac{1}{2}$. C: **Incorrect:** $\frac{3}{4} = 0.75$ is the value of the CDF $F_X(1)$, not the expected value $E[X]$. D: **Correct:** Integrating $\frac{1}{2}x(2 - x)$ from $0$ to $2$ gives $E[X] = \frac{2}{3}$.

Report a correction for Q18

Question 19 MCQ · 2.0 marks

The joint PMF of two discrete random variables
Source diagram or notation
and
Source diagram or notation
is given in the following table:
Source diagram or notation
Based on the above data, answer the given subquestions.
What is the value of
Source diagram or notation
?
6406536030580.
0.01
6406536030581.
0.10
6406536030582.
0.70
6406536030583.
0.30

Published solution

**1. Sum all probabilities in the joint PMF table and set equal to $1$:** The entries in the table are: - Row $X = 0$: $a + 0.05 + 0.00 = a + 0.05$ - Row $X = 1$: $2a + 0.15 + 0.05 = 2a + 0.20$ - Row $X = 2$: $0.05 + a + 3a = 4a + 0.05$ Total probability: $$(a + 0.05) + (2a + 0.20) + (4a + 0.05) = 7a + 0.30 = 1$$ **2. Solve for $a$:** $$7a = 0.70 \implies a = 0.10$$ **Answer: Option B** A: **Incorrect:** If $a = 0.01$, the total probability would be $0.37 \ne 1$. B: **Correct:** Summing all cells gives $7a + 0.30 = 1$, so $a = 0.10$. C: **Incorrect:** $0.70$ is the value of $7a$, not $a$. D: **Incorrect:** $0.30$ is the sum of the constant entries in the table, not $a$.

Report a correction for Q19

Question 20 NAT · 3.0 marks

The joint PMF of two discrete random variables
Source diagram or notation
and
Source diagram or notation
is given in the following table:
Source diagram or notation
Based on the above data, answer the given subquestions.
Find the value of
Source diagram or notation
. Enter the answer correct to two decimal places.

Published solution

**1. Use the complement rule to find $P(X + Y \ge 2)$:** The pairs $(x, y)$ where $X + Y < 2$ are $(0, 0)$, $(0, 1)$, and $(1, 0)$: - $P(X = 0, Y = 0) = a = 0.10$ - $P(X = 0, Y = 1) = 0.05$ - $P(X = 1, Y = 0) = 2a = 0.20$ Sum of probabilities for $X + Y < 2$: $$P(X + Y < 2) = 0.10 + 0.05 + 0.20 = 0.35$$ **2. Subtract from $1$:** $$P(X + Y \ge 2) = 1 - P(X + Y < 2) = 1 - 0.35 = 0.65$$ **Answer: 0.65**

Report a correction for Q20

Question 21 NAT · 3.0 marks

Let the random variable
Source diagram or notation
represent the number of issues resolved during a customer support call. The probability mass function of
Source diagram or notation
is given by
Source diagram or notation
where
Source diagram or notation
. A random sample of five customer ratings is {1, 2, 2, 3, 2}. Based on the above data, answer the given subquestions.
Find the method of moments estimate of
Source diagram or notation
for the given sample. Enter the answer correct to two decimal places.

Published solution

**1. Compute the population mean $E[X]$ in terms of $\theta$:** From the PMF table: $$E[X] = 1\left(\frac{1}{2} - \theta\right) + 2\left(\frac{1}{3} + \theta\right) + 3\left(\frac{1}{6}\right)$$ $$E[X] = \frac{1}{2} - \theta + \frac{2}{3} + 2\theta + \frac{3}{6} = \left(\frac{1}{2} + \frac{2}{3} + \frac{1}{2}\right) + \theta = \frac{5}{3} + \theta$$ **2. Compute the sample mean $m_1 = \bar{x}$ of $\{1, 2, 2, 3, 2\}$:** $$\bar{x} = \frac{1 + 2 + 2 + 3 + 2}{5} = \frac{10}{5} = 2$$ **3. Equate $E[X] = \bar{x}$ to find the method of moments estimate $\hat{\theta}$:** $$\frac{5}{3} + \hat{\theta} = 2 \implies \hat{\theta} = 2 - \frac{5}{3} = \frac{1}{3} \approx 0.33$$ **Answer: 0.33**

Report a correction for Q21

Question 22 MCQ · 2.0 marks

Let the random variable
Source diagram or notation
represent the number of issues resolved during a customer support call. The probability mass function of
Source diagram or notation
is given by
Source diagram or notation
where
Source diagram or notation
. A random sample of five customer ratings is {1, 2, 2, 3, 2}. Based on the above data, answer the given subquestions.
The service policy requires that the average number of issues resolved per call must be at least 1.5. Based on the estimated value of
Source diagram or notation
, determine whether this requirement is satisfied.
6406536030586.
The requirement is satisfied.
6406536030587.
The requirement is not satisfied.

Published solution

**1. Evaluate the estimated average number of issues resolved per call:** From the previous question, the expected number of issues resolved per call is: $$E[X] = \frac{5}{3} + \theta$$ Substituting the estimated value $\hat{\theta} = \frac{1}{3}$ (or noting directly that under the method of moments, the estimated mean equals the sample mean $\bar{x}$): $$\widehat{E[X]} = \frac{5}{3} + \frac{1}{3} = 2$$ **2. Compare with the service policy requirement:** Since $2 \ge 1.5$, the requirement that the average number of issues resolved per call be at least $1.5$ **is satisfied**. **Answer: Option A** A: **Correct:** With $\hat{\theta} = 1/3$, the estimated average number of issues resolved is $E[X] = 5/3 + 1/3 = 2.0$, which is greater than $1.5$. B: **Incorrect:** Even for any $\theta \ge 0$, $E[X] = 5/3 + \theta \ge 1.67 > 1.5$, so the requirement is clearly satisfied.

Report a correction for Q22