Question 106 MCQ · 2.0 marks

Match Col A with Col B for landmark outcome of industrial era
Source diagram or notation
6406532266774.
1.0:CNC, 2.0:Mass production, 3.0: Digitization, 4.0:Steam Engine
6406532266775.
1.0:Steam Engine, 2.0:mass production, 3.0: digitization, 4.0:CNC
6406532266776.
1.0:Mass production, 2.0:Steam Engine, 3.0: digitization, 4.0:CNC
6406532266777.
1.0:Steam Engine, 2.0:mass production, 3.0: CNC, 4.0: Digitization

Published solution

**1. Map the first two eras:** Industry 1.0 is associated with mechanization and steam power. Industry 2.0 is associated with electrical power, assembly lines and mass production. **2. Map the later eras:** Industry 3.0 uses electronics and computer-controlled automation, including CNC. Industry 4.0 extends this toward connected digital systems and data integration. **3. Read the complete mapping:** 1.0–Steam Engine, 2.0–Mass production, 3.0–CNC, 4.0–Digitization is the intended pairing. **Answer: D — 1.0: Steam Engine; 2.0: Mass production; 3.0: CNC; 4.0: Digitization.** **Convention note:** Digitization began before Industry 4.0. Here the fourth-era label is shorthand for broader digital connectivity and integration, rather than the claim that digital technology first appeared then. A: **Incorrect:** It places steam power in the fourth era and CNC in the first. B: **Incorrect:** It reverses the intended third- and fourth-era outcomes. C: **Incorrect:** It reverses the early eras and places CNC in the fourth instead of the third. D: **Correct:** It follows the intended historical sequence across all four eras.

Report a correction for Q106

Question 107 MCQ · 1.0 marks

Identify the Industry 4.0 version of transportation.
6406532266778.
IC engine
6406532266779.
Electric car
6406532266780.
Hyperloop

Published solution

**1. Identify the course’s advanced-transport example:** Hyperloop proposes high-speed movement of pods through low-pressure tubes, combining advanced propulsion, controls and infrastructure. **2. Match the offered choices:** Within this course’s historical examples, Hyperloop is the intended Industry 4.0 transport concept. An internal-combustion engine and an electric drivetrain alone do not define digitally connected transport. **Answer: C — Hyperloop.** **Convention note:** This is a course-specific example, not a universal technical definition of Industry 4.0. Connected, data-driven and autonomous systems can also be Industry 4.0 transport applications; an electric vehicle can incorporate them. A: **Incorrect:** The internal-combustion engine is an earlier industrial transport technology. B: **Incorrect:** Electric propulsion alone is not the course’s intended marker for Industry 4.0. C: **Correct:** Hyperloop is the advanced transport concept intended in this question.

Report a correction for Q107

Question 108 MCQ · 1.0 marks

The Production rate of an assembly line is determined by its
6406532266792.
Slowest station
6406532266793.
Fastest station
6406532266794.
Idle station
6406532266795.
None of these

Published solution

**1. Find the bottleneck:** Each unit must pass through the required stations. The station with the longest effective processing time cannot supply units as quickly as the others. **2. Convert its time into a rate:** For a simple serial line without parallel capacity, \(\text{maximum rate}=1/\max_i t_i\). Faster stations cannot remove that bottleneck merely by working faster. **Answer: A — Slowest station.** A: **Correct:** Its effective capacity limits the serial line’s sustainable throughput. B: **Incorrect:** A fast station can finish early but must wait for the bottleneck. C: **Incorrect:** An idle station is not the normal capacity-setting rule. D: **Incorrect:** The bottleneck station is already identified by A.

Report a correction for Q108

Question 109 MSQ · 1.5 marks

Select the layout(s) which require(s) general supervision:
6406532266781.
Product layout
6406532266782.
Process layout
6406532266783.
Group layout
6406532266784.
Fixed position layout

Published solution

**1. Read the positive wording:** This question asks which layouts require general supervision, rather than which permit specialized functional supervision. **2. Apply the course distinction:** In a process layout, similar operations are grouped into departments and specialist supervisors can oversee each function. Product lines, group/cellular arrangements and fixed-position projects require broader coordination of the different activities involved. **3. Select the complement of the process-layout category:** Under this teaching classification, select product, group and fixed-position layouts. **Answer: A, C, D — A, C and D.** **Convention note:** This is a simplified general-versus-specialized supervision distinction. Real factories can combine general management, specialist supervision and team autonomy in any layout; process layouts are not supervision-free. A: **Correct:** Select it: the course associates a product flow line with general coordination across its operations. B: **Incorrect:** Do not select it under this classification: functional departments permit specialized supervision, although supervision is still required. C: **Correct:** Select it: the group/cell combines activities that require team or broader coordination. D: **Correct:** Select it: a stationary-product project coordinates different specialists and resources.

Report a correction for Q109

Question 110 MCQ · 1.5 marks

Select the appropriate layout for Quadrants A, B, D in the following figure:
Source diagram or notation
6406532266785.
A: Group layout, B: Product layout , D: Process layout
6406532266786.
A: Process layout, B: Group layout , D: Product layout
6406532266787.
A: Product layout, B: Process layout , D: Group layout

Published solution

**1. Read the axes:** Variety rises upward and volume rises to the right. Thus A is high-variety/low-volume, B is high-variety/high-volume, and D is low-variety/high-volume. **2. Match the layout choices:** A needs process-layout flexibility. B uses the question’s group/cellular compromise, organizing related product families. D favors a dedicated product flow line. **Answer: B — A: Process; B: Group; D: Product.** **Convention note:** The diagram is a simplified classification. Cellular/group layouts usually serve product families at intermediate variety and volume; the quadrant labels are interpreted within this figure. A: **Incorrect:** It places a product line in the high-variety quadrant and a process layout in the low-variety/high-volume quadrant. B: **Correct:** It gives A=Process, B=Group and D=Product, matching the displayed framework. C: **Incorrect:** It assigns a product line to low volume/high variety and misses the high-volume/low-variety product quadrant.

Report a correction for Q110

Question 111 MSQ · 1.0 marks

Which of the following is an advantage of Product Layout?
6406532266788.
Small in-process inventory
6406532266789.
It can accommodate high variety of products
6406532266790.
High utilization of machines
6406532266791.
Low investment

Published solution

**1. Identify a product layout:** Workstations follow the fixed processing sequence for a standardized product. **2. Explain the inventory benefit:** A balanced, repetitive flow reduces movement and waiting between operations, helping keep work in process small. It does not guarantee low investment or high utilization under every demand level. **Answer: A — Small in-process inventory.** A: **Correct:** Continuous, coordinated flow can reduce intermediate queues and work in process. B: **Incorrect:** High variety generally favors a flexible process layout rather than a dedicated line. C: **Incorrect:** Utilization depends on demand and line balance; it is not guaranteed for all dedicated machines. D: **Incorrect:** Dedicated lines can require substantial initial investment.

Report a correction for Q111

Question 112 MSQ · 2.0 marks

Select the correct statements from below:
6406532266796.
Optimal solution in a facility location problem using Euclidean method will result in a region
6406532266797.
Optimal solution in a facility location problem using Euclidean method rarely matches the center of gravity
6406532266798.
Optimal solution in a facility location problem using Euclidean method will result in a point
6406532266799.
Optimal solution in a facility location problem using Euclidean method matches the center of gravity in not of the cases

Published solution

**1. Identify the distance objective:** The usual Euclidean location problem minimizes weighted straight-line distances: \[\min_{x,y}\sum_i w_i\sqrt{(x-x_i)^2+(y-y_i)^2}.\] Its solution is a weighted geometric median. **2. Distinguish the center of gravity:** A weighted coordinate mean minimizes the sum of squared distances, a different objective. It can coincide with a geometric median in symmetric cases, but equality is not guaranteed. **3. Interpret the standard result:** A nondegenerate Euclidean problem generally identifies a particular optimal point, rather than the median interval/rectangle possible with rectilinear distance. **Answer: B, C — B and C — generally a point, not generally the center of gravity.** **Convention note:** The question uses “rarely” informally. Coincidence depends on the data, and special collinear configurations can have an interval of minimizers. The answer assumes the usual unsquared Euclidean objective and a nondegenerate instance. A: **Incorrect:** A region is not the usual nondegenerate Euclidean-location result, though special collinear cases can have multiple optimal points. B: **Correct:** Read as “does not generally coincide”: a geometric median is not generally the weighted coordinate mean. C: **Correct:** A point is the standard nondegenerate result; this is not a uniqueness theorem for every possible dataset. D: **Incorrect:** If the malformed phrase means “none,” it is false because symmetry can produce coincidence; if it means “most,” that is not generally guaranteed.

Report a correction for Q112

Question 113 MSQ · 2.0 marks

Identify the examples for Offshoring from the list below:
6406532266800.
Shell, an oil company based in Netherlands, setting up a data science team in India.
6406532266801.
Western Australia’s electricity network agency assigns Tata Consultancy Services at Pune, to support it with an overhaul of its legacy IT systems, aimed at delivering cheaper and more reliable power.
6406532266802.
Target Corporation, a retail giant based in US, setting up Supply Chain Optimization team at Bengaluru.
6406532266803.
Tata Motors assigns the manufacturing of its braking system to TACO group.

A published solution is not available for this question yet.

Report a correction for Q113

Question 114 NAT · 1.0 marks

A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of all activity times is equal to 12 seconds. Answer the given subquestions:
What is the cycle time (in seconds) at any workstations (round your answer to one decimal).

Published solution

**1. Convert daily operating time:** Two 8-hour shifts provide \(T=2(8)(3600)=57{,}600\) seconds per day. **2. Divide time by required output:** \[C=\frac{T}{Q}=\frac{57{,}600}{30{,}000}=1.92\text{ seconds/unit}.\] **3. Apply the requested rounding:** The required line cycle time is 1.9 seconds to one decimal. This is the permitted interval between completed bulbs, not the sum of all task times. **Answer: 1.9.**

Report a correction for Q114

Question 115 NAT · 1.0 marks

A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of all activity times is equal to 12 seconds. Answer the given subquestions:
What is the theoretical minimum number of workstations required?

Published solution

**1. Compute the unrounded cycle time:** \(C=57{,}600/30{,}000=1.92\) seconds per bulb. Retain this value while calculating the station requirement. **2. Divide total work by cycle time:** \[N_{\min}=\left\lceil\frac{\sum t_i}{C}\right\rceil=\left\lceil\frac{12}{1.92}\right\rceil=\lceil6.25\rceil=7.\] **3. Interpret the bound:** A fraction of a workstation is not allowed, so round upward. Seven is a theoretical lower bound; individual task times and precedence can require more stations. **Answer: 7.**

Report a correction for Q115

Question 116 NAT · 1.0 marks

Consider the following precedence diagram. It has 12 activities. The numbers in blue and withing the braces denote the respective activity times in minute.
Source diagram or notation
Based on the above data, answer the given subquestions.
What is the minimum cycle time of the system (in minute)?

Published solution

**1. Read the task durations:** Tasks 1–12 take 5, 4, 12, 9, 10, 8, 7, 6, 9, 3, 5 and 7 minutes, respectively. **2. Apply the indivisible-task lower bound:** A workstation must be able to complete any task assigned to it within one cycle. Therefore \[C_{\min}=\max_i t_i=12\text{ minutes}.\] **3. Check feasibility with enough stations:** Assigning each task to a separate station in a topological order respects precedence and permits this cycle. Precedence affects how tasks may be grouped, not the longest-task bound itself. **Answer: 12.**

Report a correction for Q116

Question 117 NAT · 1.0 marks

Consider the following precedence diagram. It has 12 activities. The numbers in blue and withing the braces denote the respective activity times in minute.
Source diagram or notation
Based on the above data, answer the given subquestions.
What is the maximum cycle time of the system (in minute)?

Published solution

**1. Interpret the maximum conventional cycle:** If all tasks are placed at one workstation, one unit requires the entire work content before the next cycle finishes. **2. Sum the durations:** \[C_{\max}=5+4+12+9+10+8+7+6+9+3+5+7=85\text{ minutes}.\] **3. Distinguish this from the critical path:** At one workstation even tasks on different branches are done serially, so all durations are included. The term refers to productive cycle-time bounds, excluding arbitrary extra waiting. **Answer: 85.**

Report a correction for Q117

Question 118 MCQ · 1.0 marks

Consider the following precedence diagram. It has 12 activities. The numbers in blue and withing the braces denote the respective activity times in minute.
Source diagram or notation
Based on the above data, answer the given subquestions.
The factory works for one 8-hour shifts each day. Is it possible to achieve an output of 32 units/day,
6406532266808.
Yes
6406532266809.
No

Published solution

**1. Find the required cycle:** An 8-hour shift provides 480 minutes, so producing 32 units requires \[C_{required}=\frac{480}{32}=15\text{ minutes/unit}.\] **2. Compare task limits:** The longest indivisible task takes 12 minutes, below 15, so it does not prevent the target. Total work is 85 minutes, giving a lower bound of ceiling(85/15)=6 stations. **3. Exhibit a feasible balance:** Seven stations with task groups (1,2), (3), (4), (6,7), (5), (8,9), (10,11,12) have loads 9,12,9,15,10,15,15 minutes. Task 6 precedes task 5, and all other precedence links are also respected, permitting one unit each 15 minutes in steady operation. **Answer: A — Yes — feasible at a 15-minute steady-state cycle.** **Convention note:** The usual daily-output calculation assumes a running/pipelined line and no breaks, breakdowns or other losses. Starting an empty line introduces a separate initial fill time. A: **Correct:** A precedence-feasible seven-station balance achieves a 15-minute cycle. B: **Incorrect:** The longest task is only 12 minutes and a feasible 15-minute assignment exists.

Report a correction for Q118

Question 119 NAT · 2.0 marks

Consider the following precedence diagram. It has 12 activities. The numbers in blue and withing the braces denote the respective activity times in minute.
Source diagram or notation
Based on the above data, answer the given subquestions.
What is the balance delay of the following layout (round it to two decimals) (1,2) -> (3) -> (4) -> (5) -> (6,7) -> (8,9) -> (10,11,12)

Published solution

**1. Calculate the station loads:** For the groups (1,2), (3), (4), (5), (6,7), (8,9), (10,11,12), the times are 5+4=9, 12, 9, 10, 8+7=15, 6+9=15 and 3+5+7=15 minutes. **2. Find available station time and idle time:** There are \(N=7\) stations and the cycle is the largest load, \(C=15\). Total available station time is \(NC=105\) minutes per cycle; total task work is 85, leaving \(105-85=20\) idle station-minutes. **3. Compute balance delay:** \[BD=\frac{NC-\sum t_i}{NC}\times100=\frac{20}{105}\times100=19.05\%.\] This is the percentage of available station time that is idle. **Answer: 19.05.** **Convention note:** The printed station order puts task 6 after task 5 even though the diagram has 6→5. The percentage is nominal arithmetic for the stated loads, not proof that the order is feasible. Swapping stations (5) and (6,7) repairs the precedence violation while preserving the 15-minute cycle, efficiency and delay.

Report a correction for Q119

Question 120 NAT · 1.0 marks

Consider the following precedence diagram. It has 12 activities. The numbers in blue and withing the braces denote the respective activity times in minute.
Source diagram or notation
Based on the above data, answer the given subquestions.
What is the efficiency of the given layout? Round off to two decimals without percentage sign

A published solution is not available for this question yet.