Industry 4.0 · Quiz 1 · May 2024
Industry 4.0 · Quiz 1 · May 2024
← Course papers · Start practice / exam
Questions and published explanations below are available without starting a test. Some questions may not have a published solution yet.
16 / 18 published solutions
Which among the following statements is/are correct?
Global alignment involves aligning the entire sequences, while local alignment
involves aligning smaller parts/substrings of the sequence.
Alignment problem can be solved using a greedy algorithm approach.
To compute the global alignment between two sequences, free rides (zero
weight edges) are added from the source (0, 0) to every node and from every node to the sink (n,
m) in the alignment graph.
The alignment problem can be solved in linear space.
**Industry 4.0**
**Section Id :** 64065359431
**Section Number :** 8
**Section type :** Online
**Mandatory or Optional :** Mandatory
**Number of Questions :** 13
**Number of Questions to be attempted :** 13
**Section Marks :** 20
**Display Number Panel :** Yes
**Section Negative Marks :** 0
**Group All Questions :** No
**Enable Mark as Answered Mark for Review and**
No
**Clear Response :**
**Section Maximum Duration :** 0
**Section Minimum Duration :** 0
**Section Time In :** Minutes
**Maximum Instruction Time :** 0
**1. Distinguish alignment scope:** Global alignment compares both complete sequences, allowing gaps but not discarding prefixes or suffixes. Local alignment selects the highest-scoring pair of substrings.
**2. Identify the optimization method:** A locally best match or gap need not belong to a globally best alignment. Standard exact alignment uses dynamic programming rather than a generally valid greedy choice.
**3. Interpret the free edges:** Source-to-any-node and any-node-to-sink free edges allow irrelevant beginnings and endings to be skipped. Under the usual maximum-score alignment-graph convention, this is a local-alignment construction, not global alignment.
**4. Check the space claim:** Scores can be calculated using rolling rows. Hirschberg’s divide-and-conquer method can reconstruct an optimal global alignment in \(O(mn)\) time and \(O(m+n)\) space, so linear-space alignment is possible.
**Answer: A, D — A and D.**
**Convention note:** This sequence-alignment question is an extra entry carried into the Industry 4.0 export from the preceding subject section. It is solved as exported; the section metadata accidentally appended to option D is not part of the mathematical statement.
A: **Correct:** It correctly distinguishes whole-sequence alignment from substring alignment.
B: **Incorrect:** Greedy choices do not generally guarantee an optimal alignment for arbitrary sequences and scoring schemes.
C: **Incorrect:** Free rides that skip prefixes and suffixes correspond to local rather than global alignment in the usual scoring graph.
D: **Correct:** Linear-space score computation and divide-and-conquer alignment reconstruction are possible.
Question 127 MCQ · 1.0 marks
Match Col A with Col B for landmark outcome of industrial era
1.0:CNC, 2.0:Mass production, 3.0:Digitization, 4.0:Steam Engine
1.0:Steam Engine, 2.0:mass production, 3.0:digitization, 4.0:CNC
1.0:Mass production, 2.0:Steam Engine, 3.0:digitization, 4.0:CNC
1.0:Steam Engine, 2.0:mass production, 3.0:CNC, 4.0:Digitization
Published solution
**1. Map the first two eras:** Industry 1.0 is associated with mechanization and steam power. Industry 2.0 is associated with electrical power, assembly lines and mass production.
**2. Map the later eras:** Industry 3.0 uses electronics and computer-controlled automation, including CNC. Industry 4.0 extends this toward connected digital systems and data integration.
**3. Read the complete mapping:** 1.0–Steam Engine, 2.0–Mass production, 3.0–CNC, 4.0–Digitization is the intended pairing.
**Answer: D — 1.0: Steam Engine; 2.0: Mass production; 3.0: CNC; 4.0: Digitization.**
**Convention note:** Digitization began before Industry 4.0. Here the fourth-era label is shorthand for broader digital connectivity and integration, rather than the claim that digital technology first appeared then.
A: **Incorrect:** It places steam power in the fourth era and CNC in the first.
B: **Incorrect:** It reverses the intended third- and fourth-era outcomes.
C: **Incorrect:** It reverses the early eras and places CNC in the fourth instead of the third.
D: **Correct:** It follows the intended historical sequence across all four eras.
Question 128 MCQ · 1.0 marks
Identify the Industry 4.0 version of transportation.
IC engine
Electric car
Hyperloop
Published solution
**1. Identify the course’s advanced-transport example:** Hyperloop proposes high-speed movement of pods through low-pressure tubes, combining advanced propulsion, controls and infrastructure.
**2. Match the offered choices:** Within this course’s historical examples, Hyperloop is the intended Industry 4.0 transport concept. An internal-combustion engine and an electric drivetrain alone do not define digitally connected transport.
**Answer: C — Hyperloop.**
**Convention note:** This is a course-specific example, not a universal technical definition of Industry 4.0. Connected, data-driven and autonomous systems can also be Industry 4.0 transport applications; an electric vehicle can incorporate them.
A: **Incorrect:** The internal-combustion engine is an earlier industrial transport technology.
B: **Incorrect:** Electric propulsion alone is not the course’s intended marker for Industry 4.0.
C: **Correct:** Hyperloop is the advanced transport concept intended in this question.
Question 129 MCQ · 1.0 marks
Following is the layout from an aircraft manufacturing company. Identify the layout from the
figure below.
Product layout
Process Layout
Group layout
Fixed position layout.
Published solution
**1. Identify the intended production setting:** Aircraft assembly involves a large, heavy product for which moving every partially assembled unit through small functional departments can be impractical.
**2. Apply the fixed-position principle:** The aircraft stays at its assembly position while workers, tools and components are brought to it. This is the fixed-position layout intended by the question.
**Answer: D — Fixed position layout..**
**Convention note:** The campus-style image labels functional buildings and does not itself prove that every aircraft operation is stationary. Real aircraft plants can combine layouts; D is the intended final-assembly classification.
A: **Incorrect:** A product layout moves work through a fixed sequence of stations; it is not the intended stationary-aircraft arrangement.
B: **Incorrect:** A process layout groups similar functions and routes jobs between them.
C: **Incorrect:** A group layout organizes resources into cells for product families.
D: **Correct:** The large aircraft remains in place while resources come to the assembly location.
Question 130 MCQ · 1.0 marks
Select the appropriate layout for Quadrants A, B, D in the following figure:
A: Group layout, B: Product layout , D: Process layout
A: Product layout, B: Process layout , D: Group layout
A: Process layout, B: Group layout , D: Product layout
Published solution
**1. Read the axes:** Variety rises upward and volume rises to the right. Thus A is high-variety/low-volume, B is high-variety/high-volume, and D is low-variety/high-volume.
**2. Match the layout choices:** A needs process-layout flexibility. B uses the question’s group/cellular compromise, organizing related product families. D favors a dedicated product flow line.
**Answer: C — A: Process; B: Group; D: Product.**
**Convention note:** The diagram is a simplified classification. Cellular/group layouts usually serve product families at intermediate variety and volume; the quadrant labels are interpreted within this figure.
A: **Incorrect:** It places a product line in the high-variety quadrant and a process layout in the low-variety/high-volume quadrant.
B: **Incorrect:** It assigns a product line to low volume/high variety and misses the high-volume/low-variety product quadrant.
C: **Correct:** It gives A=Process, B=Group and D=Product, matching the displayed framework.
Question 131 MCQ · 1.0 marks
The Production rate of an assembly line is determined by its
Slowest station
Fastest station
Idle station
None of these
Published solution
**1. Find the bottleneck:** Each unit must pass through the required stations. The station with the longest effective processing time cannot supply units as quickly as the others.
**2. Convert its time into a rate:** For a simple serial line without parallel capacity, \(\text{maximum rate}=1/\max_i t_i\). Faster stations cannot remove that bottleneck merely by working faster.
**Answer: A — Slowest station.**
A: **Correct:** Its effective capacity limits the serial line’s sustainable throughput.
B: **Incorrect:** A fast station can finish early but must wait for the bottleneck.
C: **Incorrect:** An idle station is not the normal capacity-setting rule.
D: **Incorrect:** The bottleneck station is already identified by A.
Question 132 MSQ · 1.0 marks
Select the layout(s) which do not require general supervision:
Product layout
Process layout
Group layout
Fixed position layout
Published solution
**1. Interpret the supervision distinction:** A process layout groups similar machines or operations into functional departments. Each department can be supervised by a specialist in that process.
**2. Identify the intended answer:** This enables specialized/functional supervision rather than relying only on one general supervisor across unlike operations. It does not eliminate supervision.
**Answer: B — Process layout.**
**Convention note:** Read “do not require general supervision” as “permit specialized functional supervision.” A process layout still requires supervision and can be demanding to schedule.
A: **Incorrect:** A flow line still needs line coordination and supervision; it is not the functional-supervision answer sought.
B: **Correct:** Grouping like processes supports specialized departmental supervision.
C: **Incorrect:** Cells may support team supervision, but this is not the course’s intended functional-layout distinction.
D: **Incorrect:** A stationary-product project still requires coordination of multiple specialties.
Question 133 MSQ · 1.0 marks
Which of the following is an advantage of Process Layout?
Low material handling
Total production time per unit is small
Low training cost for the operators
It can accommodate high variety of products
Published solution
**1. Identify a process layout:** Similar equipment or functions are grouped together, and each job follows the departments needed for its own processing requirements.
**2. Identify the principal advantage:** Different products can follow different routes, giving flexibility for high variety and lower-volume production. This flexibility typically brings more handling, scheduling and operator-skill requirements.
**Answer: D — It can accommodate high variety of products.**
A: **Incorrect:** Variable routing generally increases material movement relative to a dedicated flow line.
B: **Incorrect:** Queues, moves and different routes can lengthen throughput time.
C: **Incorrect:** General-purpose equipment and varied jobs usually require skilled operators and substantial training.
D: **Correct:** Flexible routing can accommodate many different product types.
Question 134 MSQ · 1.0 marks
Which of the following is an advantage of Product Layout?
Small in-process inventory
It can accommodate high variety of products
High utilization of machines
Low investment
Published solution
**1. Identify a product layout:** Workstations follow the fixed processing sequence for a standardized product.
**2. Explain the inventory benefit:** A balanced, repetitive flow reduces movement and waiting between operations, helping keep work in process small. It does not guarantee low investment or high utilization under every demand level.
**Answer: A — Small in-process inventory.**
A: **Correct:** Continuous, coordinated flow can reduce intermediate queues and work in process.
B: **Incorrect:** High variety generally favors a flexible process layout rather than a dedicated line.
C: **Incorrect:** Utilization depends on demand and line balance; it is not guaranteed for all dedicated machines.
D: **Incorrect:** Dedicated lines can require substantial initial investment.
Question 135 MSQ · 1.0 marks
Select the correct statements from below:
Optimal solution in a facility location problem using Euclidean method will
result in a region
Optimal solution in a facility location problem using Euclidean method rarely
matches the center of gravity
Optimal solution in a facility location problem using Euclidean method will
result in a point
Optimal solution in a facility location problem using Euclidean method
matches the center of gravity in neither cases
Published solution
**1. Identify the distance objective:** The usual Euclidean location problem minimizes weighted straight-line distances: \[\min_{x,y}\sum_i w_i\sqrt{(x-x_i)^2+(y-y_i)^2}.\] Its solution is a weighted geometric median.
**2. Distinguish the center of gravity:** A weighted coordinate mean minimizes the sum of squared distances, a different objective. It can coincide with a geometric median in symmetric cases, but equality is not guaranteed.
**3. Interpret the standard result:** A nondegenerate Euclidean problem generally identifies a particular optimal point, rather than the median interval/rectangle possible with rectilinear distance.
**Answer: B, C — B and C — generally a point, not generally the center of gravity.**
**Convention note:** The question uses “rarely” informally. Coincidence depends on the data, and special collinear configurations can have an interval of minimizers. The answer assumes the usual unsquared Euclidean objective and a nondegenerate instance.
A: **Incorrect:** A region is not the usual nondegenerate Euclidean-location result, though special collinear cases can have multiple optimal points.
B: **Correct:** Read as “does not generally coincide”: a geometric median is not generally the weighted coordinate mean.
C: **Correct:** A point is the standard nondegenerate result; this is not a uniqueness theorem for every possible dataset.
D: **Incorrect:** If “in neither cases” means never, the statement is false: a symmetric demand configuration can make the geometric median and weighted center of gravity coincide.
Question 136 MSQ · 1.0 marks
Identify the examples for Offshoring from the list below:
Micron Technology, a US based semiconductor giant, setting up a Supply
Chain Analytics team, in India.
Micron signs an agreement with Taiwan based TSMC Co., to manufacture
sillicon wafer for their ICs.
Western Australia’s electricity network agency assigns Tata Consultancy
Services at Pune, to support it with an overhaul of its legacy IT systems, aimed at delivering
cheaper and more reliable power.
Tata Motors assigns the manufacturing of its braking system to TACO group.
A published solution is not available for this question yet.
Question 137 NAT · 1.5 marks
A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a
set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of
all activity times is equal to 12 seconds. Answer the given subquestions:
What is the cycle time (in seconds) at any workstations (round your answer to one decimal).
Published solution
**1. Convert daily operating time:** Two 8-hour shifts provide \(T=2(8)(3600)=57{,}600\) seconds per day.
**2. Divide time by required output:** \[C=\frac{T}{Q}=\frac{57{,}600}{30{,}000}=1.92\text{ seconds/unit}.\]
**3. Apply the requested rounding:** The required line cycle time is 1.9 seconds to one decimal. This is the permitted interval between completed bulbs, not the sum of all task times.
**Answer: 1.9.**
Question 138 NAT · 1.5 marks
A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a
set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of
all activity times is equal to 12 seconds. Answer the given subquestions:
What is the theoretical minimum number of workstations required?
Published solution
**1. Compute the unrounded cycle time:** \(C=57{,}600/30{,}000=1.92\) seconds per bulb. Retain this value while calculating the station requirement.
**2. Divide total work by cycle time:** \[N_{\min}=\left\lceil\frac{\sum t_i}{C}\right\rceil=\left\lceil\frac{12}{1.92}\right\rceil=\lceil6.25\rceil=7.\]
**3. Interpret the bound:** A fraction of a workstation is not allowed, so round upward. Seven is a theoretical lower bound; individual task times and precedence can require more stations.
**Answer: 7.**
Question 139 NAT · 1.0 marks
Consider the following precedence diagram. It has 12 activities. The numbers in blue and within
the braces denote the respective activity times in minutes.
Answer the given subquestions based on the above diagram.
What is the minimum cycle time of the system?(in min)
Published solution
**1. Read the task durations:** Tasks 1–12 take 5, 4, 12, 9, 10, 8, 7, 6, 9, 3, 5 and 7 minutes, respectively.
**2. Apply the indivisible-task lower bound:** A workstation must be able to complete any task assigned to it within one cycle. Therefore \[C_{\min}=\max_i t_i=12\text{ minutes}.\]
**3. Check feasibility with enough stations:** Assigning each task to a separate station in a topological order respects precedence and permits this cycle. Precedence affects how tasks may be grouped, not the longest-task bound itself.
**Answer: 12.**
Question 140 NAT · 1.0 marks
Consider the following precedence diagram. It has 12 activities. The numbers in blue and within
the braces denote the respective activity times in minutes.
Answer the given subquestions based on the above diagram.
What is the maximum cycle time of the system?(in min)
Published solution
**1. Interpret the maximum conventional cycle:** If all tasks are placed at one workstation, one unit requires the entire work content before the next cycle finishes.
**2. Sum the durations:** \[C_{\max}=5+4+12+9+10+8+7+6+9+3+5+7=85\text{ minutes}.\]
**3. Distinguish this from the critical path:** At one workstation even tasks on different branches are done serially, so all durations are included. The term refers to productive cycle-time bounds, excluding arbitrary extra waiting.
**Answer: 85.**
Question 141 MCQ · 1.5 marks
Consider the following precedence diagram. It has 12 activities. The numbers in blue and within
the braces denote the respective activity times in minutes.
Answer the given subquestions based on the above diagram.
The factory works for one 8-hour shifts each day. Is it possible to achieve an output of 32
units/day,
Yes
No
Published solution
**1. Find the required cycle:** An 8-hour shift provides 480 minutes, so producing 32 units requires \[C_{required}=\frac{480}{32}=15\text{ minutes/unit}.\]
**2. Compare task limits:** The longest indivisible task takes 12 minutes, below 15, so it does not prevent the target. Total work is 85 minutes, giving a lower bound of ceiling(85/15)=6 stations.
**3. Exhibit a feasible balance:** Seven stations with task groups (1,2), (3), (4), (6,7), (5), (8,9), (10,11,12) have loads 9,12,9,15,10,15,15 minutes. Task 6 precedes task 5, and all other precedence links are also respected, permitting one unit each 15 minutes in steady operation.
**Answer: A — Yes — feasible at a 15-minute steady-state cycle.**
**Convention note:** The usual daily-output calculation assumes a running/pipelined line and no breaks, breakdowns or other losses. Starting an empty line introduces a separate initial fill time.
A: **Correct:** A precedence-feasible seven-station balance achieves a 15-minute cycle.
B: **Incorrect:** The longest task is only 12 minutes and a feasible 15-minute assignment exists.
Question 142 NAT · 2.0 marks
Consider the following precedence diagram. It has 12 activities. The numbers in blue and within
the braces denote the respective activity times in minutes.
Answer the given subquestions based on the above diagram.
What is the balance delay of the following layout (round it to two decimals)(in %)
(1,2) -> (3) -> (4) -> (5) -> (6,7) -> (8,9) -> (10,11,12)
Published solution
**1. Calculate the station loads:** For the groups (1,2), (3), (4), (5), (6,7), (8,9), (10,11,12), the times are 5+4=9, 12, 9, 10, 8+7=15, 6+9=15 and 3+5+7=15 minutes.
**2. Find available station time and idle time:** There are \(N=7\) stations and the cycle is the largest load, \(C=15\). Total available station time is \(NC=105\) minutes per cycle; total task work is 85, leaving \(105-85=20\) idle station-minutes.
**3. Compute balance delay:** \[BD=\frac{NC-\sum t_i}{NC}\times100=\frac{20}{105}\times100=19.05\%.\] This is the percentage of available station time that is idle.
**Answer: 19.05.**
**Convention note:** The printed station order puts task 6 after task 5 even though the diagram has 6→5. The percentage is nominal arithmetic for the stated loads, not proof that the order is feasible. Swapping stations (5) and (6,7) repairs the precedence violation while preserving the 15-minute cycle, efficiency and delay.
Question 143 NAT · 1.5 marks
Consider the following precedence diagram. It has 12 activities. The numbers in blue and within
the braces denote the respective activity times in minutes.
Answer the given subquestions based on the above diagram.
What is the efficiency of the given layout? Round off to two decimals without percentage sign
(1,2) -> (3) -> (4) -> (5) -> (6,7) -> (8,9) -> (10,11,12)
A published solution is not available for this question yet.