Question 2 MCQ · 3.0 marks

In which of the following types of testing is the fully integrated system tested by the test team within the organization?
6406533529336.
Integration testing
6406533529337.
Acceptance testing
6406533529338.
Alpha testing
6406533529339.
Beta testing.

A published solution is not available for this question yet.

Report a correction for Q2

Question 3 MCQ · 3.0 marks

Consider a function that takes two strings as input and compares the length of two strings. If the lengths of the strings are equal, it returns 0. If the length of the first string is greater than that of the second string, it returns a positive integer. If the length of the first string is less than that of the second string, it returns a negative integer. Identify the number of equivalence classes for black box testing of the program discussed above.
6406533529344.
2
6406533529345.
3
6406533529346.
4
6406533529347.
5

A published solution is not available for this question yet.

Report a correction for Q3

Question 4 MCQ · 3.0 marks

Which deployment strategy gradually rolls out changes to a small subset of users?
6406533529356.
Blue/Green Deployment
6406533529357.
Canary Deployment
6406533529358.
Versioned Deployment
6406533529359.
None of these

A published solution is not available for this question yet.

Report a correction for Q4

Question 5 MCQ · 3.0 marks

Suppose you are planning to deploy a data-intensive analytics application. Your main priority is scalability to handle fluctuating workloads, and you prefer a pay-as-you-go pricing model without managing the underlying hardware (but you want control of the software layer). Which of the following hosting options will be most suitable for you?
6406533529364.
Bare metal servers
6406533529365.
Infrastructure-as-a-service
6406533529366.
Platform-as-a-service
6406533529367.
Software-as-a-service

A published solution is not available for this question yet.

Report a correction for Q5

Question 6 MCQ · 3.0 marks

Which of the following strategies uses tools like Memcached and Redis to improve the performance of web applications?
6406533529368.
Caching
6406533529369.
Task queues
6406533529370.
Loading and rendering pages
6406533529371.
Monitoring

A published solution is not available for this question yet.

Report a correction for Q6

Question 7 MCQ · 3.0 marks

A software organization wants to use a tool that enables all team members to get both a big- picture view and a detailed view of progress. What kind of tool can the organization use?
6406533529376.
Project management tools
6406533529377.
Development tools
6406533529378.
Knowledge-sharing tools
6406533529379.
None of these

A published solution is not available for this question yet.

Report a correction for Q7

Question 8 MCQ · 3.0 marks

Source diagram or notation
6406533529384.
Data coupling
6406533529385.
Control coupling
6406533529386.
Common coupling
6406533529387.
Content coupling

A published solution is not available for this question yet.

Report a correction for Q8

Question 9 MCQ · 3.0 marks

You have designed software in which each module is responsible for performing varied operations, and a significant amount of data is exchanged between modules. Identify the types of cohesion and coupling in the designed software.
6406533529388.
Low cohesion and low coupling
6406533529389.
Low cohesion and high coupling
6406533529390.
High cohesion and low coupling
6406533529391.
High cohesion and high coupling

A published solution is not available for this question yet.

Report a correction for Q9

Question 10 MCQ · 3.0 marks

Which software metric determines the quality of the code based on the number of operands and operations involved?
6406533529392.
Cyclomatic Complexity
6406533529393.
Raw Metrics
6406533529394.
Halstead’s Metrics
6406533529395.
All of these

A published solution is not available for this question yet.

Report a correction for Q10

Question 11 MCQ · 3.0 marks

Consider analyzing a program to identify performance bottlenecks by measuring the time taken by each function or the frequency of function calls during execution. What type of debugging or analysis technique is used in this case?
6406533529396.
Logging
6406533529397.
Dump and diff
6406533529398.
Stepping in debugger
6406533529399.
Profiling tool

A published solution is not available for this question yet.

Report a correction for Q11

Question 12 MCQ · 3.0 marks

Match the following.
Source diagram or notation
6406533529400.
1-B, 2-D, 3-C, 4-A
6406533529401.
1-B, 2-D, 3-A, 4-C
6406533529402.
1-C, 2-A, 3-D, 4-B
6406533529403.
1-C, 2-A, 3-B, 4-D

A published solution is not available for this question yet.

Report a correction for Q12

Question 13 MCQ · 3.0 marks

Which of the following risks arises when the development team has insufficient knowledge of the product?
6406533529424.
Technical risks
6406533529425.
Project risks
6406533529426.
Business risks
6406533529427.
None of these

A published solution is not available for this question yet.

Report a correction for Q13

Question 14 MCQ · 3.0 marks

In the Scrum framework, what does velocity mean?
6406533529432.
Number of user stories completed per iteration/sprint
6406533529433.
Number of user stories completed for all the sprints
6406533529434.
Number of points per iteration/sprint
6406533529435.
Amount of effort for each user story

A published solution is not available for this question yet.

Report a correction for Q14

Question 15 MCQ · 3.0 marks

Which SMART characteristic specifies that a user story should provide business value to at least one stakeholder?
6406533529452.
Measurable
6406533529453.
Achievable
6406533529454.
Relevant
6406533529455.
Timeboxed

A published solution is not available for this question yet.

Report a correction for Q15

Question 16 MCQ · 4.0 marks

Consider the Python code below.
Source diagram or notation
Identify the number of linearly independent paths to be tested for path coverage.
6406533529348.
2
6406533529349.
3
6406533529350.
4
6406533529351.
5

A published solution is not available for this question yet.

Report a correction for Q16

Question 17 MCQ · 4.0 marks

Consider the Python code below.
Source diagram or notation
Identify the set of valid test cases that provides multiple condition coverage.
6406533529352.
{password = "ab", password = "abcd", password = "abcdef"}
6406533529353.
{password = "ab", password = "abcdefghi", password = "abcdef"}
6406533529354.
{password = "ab", password = "abcdefghi", password = "", password = "abcd"}
6406533529355.
{password = "ab", password = "abcdefghi", password = "abcdef", password = "abcd"}

A published solution is not available for this question yet.

Report a correction for Q17

Question 18 MCQ · 4.0 marks

In a data processing application, raw sensor data is collected and passed through a series of stages: first, the data is cleaned, then it is normalized, after which statistical analyses are performed, and finally, visualizations are generated. Each stage processes the output from the previous stage and passes it to the next. Which type of architecture is used in this data processing application?
6406533529404.
Client-server
6406533529405.
Pipe and filter
6406533529406.
Model-view-controller
6406533529407.
Peer-to-peer

A published solution is not available for this question yet.

Report a correction for Q18

Question 19 MCQ · 4.0 marks

Source diagram or notation
6406533529408.
Builder design pattern
6406533529409.
Facade design pattern
6406533529410.
Adapter design pattern
6406533529411.
Strategy design pattern

A published solution is not available for this question yet.

Report a correction for Q19

Question 20 MCQ · 4.0 marks

Source diagram or notation
6406533529412.
Open-Closed principle
6406533529413.
Liskov substitution principle
6406533529414.
Interface segregation principle
6406533529415.
Dependency inversion principle

A published solution is not available for this question yet.

Report a correction for Q20

Question 21 MCQ · 4.0 marks

Consider the following information available for risk assessment of a project.
Source diagram or notation
Which of the following risks is most probable to occur in the given project?
6406533529428.
Schedule Slippage
6406533529429.
Gold plating
6406533529430.
Shortcomings in external components
6406533529431.
Insufficient domain knowledge

A published solution is not available for this question yet.

Report a correction for Q21

Question 22 MCQ · 4.0 marks

Consider a project management tool that allows users to create and manage tasks. The interface provides multiple ways to interact with the system: users can add tasks via a detailed form, use drag-and-drop functionality to create tasks on a visual board, or use keyboard shortcuts for quick task entry. Advanced users can also customize their workspace layout and save presets for different project types. Which of the following UI evaluation heuristics is demonstrated in this scenario?
6406533529436.
Freedom
6406533529437.
Flexibility
6406533529438.
Prevent error
6406533529439.
Provide help

A published solution is not available for this question yet.

Report a correction for Q22

Question 23 MCQ · 4.0 marks

An event planning app allows users to organize schedules, send invites, and track RSVPs. However, the app uses a very unique set of icons and labels for its features, which are hard to recall for users who don’t use the app frequently. Users often struggle to access key features or complete tasks like editing guest lists or viewing event details after not using the app for a while. What kind of usability goal is missing from the mobile app?
6406533529440.
Efficiency
6406533529441.
Memorability
6406533529442.
Safety
6406533529443.
Learnability

A published solution is not available for this question yet.

Report a correction for Q23

Question 24 MCQ · 4.0 marks

A startup developing a fitness center management platform studies daily gym operations to understand how staff manage memberships, schedule personal training sessions, and track equipment usage. The goal is to identify issues such as overlapping schedules, missed booking notifications, or difficulties updating member profiles. Identify the type of requirement collection technique used in the given scenario.
6406533529448.
Questionnaires
6406533529449.
Interviews
6406533529450.
Focus Groups
6406533529451.
Naturalistic Observations

A published solution is not available for this question yet.

Report a correction for Q24

Question 25 MSQ · 3.0 marks

Which of the following is/are true about designing test cases for blackbox testing?
6406533529340.
Test cases are designed to examine only the input and output values.
6406533529341.
Designing test cases necessitates access to the source code.
6406533529342.
No knowledge of the underlying design or code required
6406533529343.
The structure of the program needs to be analyzed using some heuristics.

A published solution is not available for this question yet.

Report a correction for Q25

Question 26 MSQ · 3.0 marks

Source diagram or notation
6406533529360.
Developers commit the code to a continuous integration server.
6406533529361.
After each commit, the continuous integration server pulls the new code from the version control system.
6406533529362.
The code pulled from the version control system is built and tested on the continuous integration server.
6406533529363.
The code is finally built, tested, and deployed by the continuous integration server.

A published solution is not available for this question yet.

Report a correction for Q26

Question 27 MSQ · 3.0 marks

Which of the following is/are the primary task/s of sales team in a software organization?
6406533529372.
Conduct market research and look for opportunities in the market
6406533529373.
Sell the product it to users that marketing team has identified
6406533529374.
Resolving interpersonal conflict between engineers
6406533529375.
Provide feedback to marketing, product, and design teams regarding the product, which engineers then address.

A published solution is not available for this question yet.

Report a correction for Q27

Question 28 MSQ · 3.0 marks

In today's world, where software development occurs in distributed environments, it is crucial for developers to create precise interface definitions. Based on the provided options, which statement(s) regarding interface definitions is/are correct?
6406533529444.
It describes the capabilities of a function.
6406533529445.
It provides the implementation details of a function.
6406533529446.
It tells which requests are allowed and how the output will be formatted.
6406533529447.
The code implementing the interface should remain unchanged until the interface remains the same.

A published solution is not available for this question yet.

Report a correction for Q28

Question 29 MSQ · 4.0 marks

Source diagram or notation
6406533529380.Source diagram or notation
6406533529381.Source diagram or notation
6406533529382.Source diagram or notation
6406533529383.Source diagram or notation

A published solution is not available for this question yet.

Report a correction for Q29

Question 30 MCQ · 4.0 marks

A company has been assigned the development of a smart home controller system. This controller is designed to centralize and integrate multiple devices, including lighting, HVAC systems (Heating, Ventilation, and Air Conditioning), and security cameras. The project requires creating both hardware-specific drivers and application-level software to enable smooth and efficient operation. The values for the constants in the COCOMO model for the different types of projects are as follows:
Source diagram or notation
Based on the above data, answer the given subquestions.
Considering that the source code is 1,00,000 lines, what is the initial estimated effort for the project?
6406533529416.
303 person-month
6406533529417.
208 person-month
6406533529418.
522 person-month
6406533529419.
905 person-month

A published solution is not available for this question yet.

Report a correction for Q30

Question 31 MCQ · 2.0 marks

A company has been assigned the development of a smart home controller system. This controller is designed to centralize and integrate multiple devices, including lighting, HVAC systems (Heating, Ventilation, and Air Conditioning), and security cameras. The project requires creating both hardware-specific drivers and application-level software to enable smooth and efficient operation. The values for the constants in the COCOMO model for the different types of projects are as follows:
Source diagram or notation
Based on the above data, answer the given subquestions.
Considering the effort adjustment factor is 1.62, what is the final estimated effort for the project?
6406533529420.
1467 person-month
6406533529421.
491 person-month
6406533529422.
524 person-month
6406533529423.
907 person-month       **Sw Testing** **Section Id :** 64065375572 **Section Number :** 2 **Section type :** Online **Mandatory or Optional :** Mandatory **Number of Questions :** 17 **Number of Questions to be attempted :** 17 **Section Marks :** 100 **Display Number Panel :** Yes **Section Negative Marks :** 0 **Group All Questions :** No **Enable Mark as Answered Mark for Review and** No **Clear Response :** **Section Maximum Duration :** 0 **Section Minimum Duration :** 0 **Section Time In :** Minutes **Maximum Instruction Time :** 0