MauryaHub PYQ Practice

Industry 4.0 · Quiz 1 · Jan 2025

Industry 4.0 · Quiz 1 · Jan 2025

← Course papers · Start practice / exam

This page contains the reliably extracted subset, not the complete original paper.

Questions and published explanations below are available without starting a test. Some questions may not have a published solution yet.

13 / 15 published solutions

Question 278 MCQ · 1.0 marks

Select the appropriate layout for Quadrants A, B, D in the following figure:
Source diagram or notation
6406533823027.
A: Group layout, B: Product layout , D: Process layout
6406533823028.
A: Product layout, B: Process layout , D: Group layout
6406533823029.
A: Process layout, B: Group layout , D: Product layout

Published solution

**1. Concept:** Layout depends on variety and volume. High variety with low volume suits a process layout. Low variety with high volume suits a product layout. Between them is the group layout. **2. Map the quadrants:** - A (high variety, low volume): process layout. - B (high variety, high volume): group layout. - D (low variety, high volume): product layout. **3. Conclude:** A: Process, B: Group, D: Product. Answer: C — A: Process layout, B: Group layout, D: Product layout. A: **Incorrect:** A needs a process layout, and D needs a product layout. B: **Incorrect:** A is not a product layout; B is not a process layout. C: **Correct:** A: Process, B: Group, D: Product matches the variety-volume chart.

Report a correction for Q278

Question 279 MCQ · 1.0 marks

Which of the following is an advantage of Process Layout?
6406533823030.
Low material handling
6406533823031.
Total production time per unit is small
6406533823032.
Low training cost for the operators
6406533823033.
It can accommodate high variety of products

Published solution

**1. Concept:** A process layout groups similar machines or functions together. It is flexible but has long, mixed routes. **2. Check:** Low material handling, short production time per unit and low training cost are advantages of a product layout, not of a process layout. Process layout needs skilled operators and has heavy movement of materials. **3. Conclude:** Its advantage is that it can handle a high variety of products. Answer: D — It can accommodate high variety of products. A: **Incorrect:** Process layout has high material handling because routes differ for each job. B: **Incorrect:** Process layout has long production time because jobs move between departments. C: **Incorrect:** Process layout needs skilled operators, so training cost is not low. D: **Correct:** Flexibility for many products is the main advantage of process layout.

Report a correction for Q279

Question 280 MCQ · 1.0 marks

Following is the layout from an aircraft manufacturing company. Identify the layout from the figure below.
Source diagram or notation
6406533823034.
Product layout
6406533823035.
Process Layout
6406533823036.
Group layout
6406533823037.
Fixed position layout.

Published solution

**1. Concept:** In a fixed position layout, the large product stays in one place and workers, materials and equipment move to it. **2. Apply:** Aircraft are too large and complex to move through stations, so assembly takes place in a fixed location. **3. Conclude:** The layout is a fixed position layout. Answer: D — Fixed position layout. A: **Incorrect:** A product layout moves work along a line of stations. B: **Incorrect:** A process layout groups similar machines, not one large product. C: **Incorrect:** A group layout forms cells for families of parts. D: **Correct:** Large products like aircraft stay in one place during assembly.

Report a correction for Q280

Question 281 MCQ · 1.5 marks

Source diagram or notation
6406533823038.
1.0:CNC, 2.0:Mass production, 3.0: Digitization, 4.0:Steam Engine
6406533823039.
1.0:Steam Engine, 2.0:mass production, 3.0: Digitization, 4.0:CNC
6406533823040.
1.0:Mass production, 2.0:Steam Engine, 3.0: Digitization, 4.0:CNC
6406533823041.
1.0:Steam Engine, 2.0:mass production, 3.0: CNC, 4.0: Digitization

Published solution

**1. Recall the eras:** Industry 1.0 = steam engine (mechanization). Industry 2.0 = mass production (electricity, assembly lines). Industry 3.0 = automation (CNC, computers). Industry 4.0 = digitization (smart, connected systems). **2. Conclude:** 1.0: Steam Engine, 2.0: Mass production, 3.0: CNC, 4.0: Digitization. Answer: D — 1.0: Steam Engine, 2.0: Mass production, 3.0: CNC, 4.0: Digitization. A: **Incorrect:** Steam engine is 1.0 and digitization is 4.0; this mapping is reversed. B: **Incorrect:** CNC belongs to 3.0 and digitization to 4.0. C: **Incorrect:** Mass production is 2.0 and steam engine is 1.0. D: **Correct:** Matches all four eras correctly.

Report a correction for Q281

Question 282 MSQ · 2.0 marks

When will of the following scenarios, a facility layout problem is relevant?
6406533823042.
A new facility is added
6406533823043.
A new product is introduced
6406533823044.
A new service is introduced
6406533823045.
Shift in technology

Published solution

**1. Concept:** A facility layout problem arises whenever the arrangement of work areas needs to be decided or revised. **2. Check:** A new facility needs a layout. A new product or service changes the flow of work. A shift in technology changes equipment and flow. **3. Conclude:** All four scenarios make the layout problem relevant. Answer: A, B, C, D — all four scenarios. A: **Correct:** A new facility needs a layout. B: **Correct:** A new product changes the process flow. C: **Correct:** A new service changes the work flow. D: **Correct:** New technology changes equipment and flow.

Report a correction for Q282

Question 283 MSQ · 2.0 marks

Identify the examples for Offshoring from the list below:
6406533823046.
Shell, an oil company based in Netherlands, setting up a data science team in India.
6406533823047.
Western Australia’s electricity network agency assigns Tata Consultancy Services at Pune, to support it with an overhaul of its legacy IT systems, aimed at delivering cheaper and more reliable power.
6406533823048.
Target Corporation, a retail giant based in US, setting up Supply Chain Optimization team at Bengaluru.
6406533823049.
Tata Motors assigns the manufacturing of its braking system to TACO group.

A published solution is not available for this question yet.

Report a correction for Q283

Question 284 MSQ · 2.0 marks

Select the correct statements from below:
6406533823050.
Optimal solution in a facility location problem using Euclidean method will result in a region
6406533823051.
Optimal solution in a facility location problem using Euclidean method rarely matches the center of gravity
6406533823052.
Optimal solution in a facility location problem using Euclidean method will result in a point
6406533823053.
Optimal solution in a facility location problem using Euclidean method matches the center of gravity in not of the cases

Published solution

**1. Concept:** In the Euclidean (straight-line distance) single-facility location problem, we minimize the total weighted straight-line distance. The solution is a single point. **2. Compare with center of gravity:** The center of gravity minimizes the weighted squared distance, which is a different objective. So the two usually do not coincide, and only rarely match. **3. Check the options:** - Region: false, the solution is a point. - Rarely matches the center of gravity: true. - Result is a point: true. - 'Matches in none of the cases': false, since they sometimes match (for example, with one demand point). Answer: B, C — the optimal solution is a point and rarely matches the center of gravity. A: **Incorrect:** The optimal solution is a single point, not a region. B: **Correct:** The Euclidean optimum and the center of gravity minimize different objectives, so they rarely match. C: **Correct:** The Euclidean solution is a single point. D: **Incorrect:** They can match in some special cases, so 'none of the cases' is too strong (the wording of this option is also unclear).

Report a correction for Q284

Question 285 MSQ · 1.5 marks

There are four demand points at A(1,2), B(2,3), C(3,5), D(4,1). The respective demand at these points are 7, 1, 3, 5. Select the optimal location based on cross-median approach.
6406533823054.
(2,2)
6406533823055.
(3,2)
6406533823056.
(2.5,2)
6406533823057.
(2,3)

Published solution

**1. Concept:** The cross-median method finds the median location separately for x and y, weighted by demand. Total demand \(=7+1+3+5=16\), so half is 8. **2. x-coordinate:** Sort by x and add demand: x=1 (7), x=2 (cumulative 8), x=3 (11), x=4 (16). Cumulative demand reaches exactly 8 at x=2, so any x between 2 and 3 is optimal. **3. y-coordinate:** Sort by y: y=1 (5), y=2 (cumulative 12), y=3 (13), y=5 (16). Cumulative demand first passes 8 at y=2, so the optimal y is 2. **4. Check options:** Points with \(2\le x\le3\) and \(y=2\) are optimal: (2,2), (3,2), (2.5,2). The point (2,3) has \(y=3\), which is not optimal. Answer: A, B, C — (2,2), (3,2) and (2.5,2). A: **Correct:** x=2 is in the median range and y=2 is the median, so it is optimal. B: **Correct:** x=3 is the end of the median range and y=2, so it is optimal. C: **Correct:** x=2.5 is in the median range and y=2, so it is optimal. D: **Incorrect:** y=3 is not the weighted median of y (it is 2), so it is not optimal.

Report a correction for Q285

Question 286 NAT · 1.0 marks

A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of all activity times is equal to 12 seconds. Answer the given subquestions:
What is the cycle time (in seconds) at any workstations (round your answer to one decimal).

Published solution

**1. Given:** Two 8-hour shifts, so total time per day \(=2\times8\times3600=57{,}600\) s. Output \(=30{,}000\) bulbs. **2. Formula:** Cycle time \(=\frac{\text{available time}}{\text{output}}\). **3. Calculate:** \[ CT=\frac{57600}{30000}=1.92\approx1.9\text{ s} \] Answer: \(1.9\) seconds.

Report a correction for Q286

Question 287 NAT · 1.0 marks

A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of all activity times is equal to 12 seconds. Answer the given subquestions:
What is the theoretical minimum number of workstations required?

Published solution

**1. Formula:** Theoretical minimum number of workstations \(=\frac{\sum t}{CT}\), rounded up. **2. Calculate:** \(\sum t=12\) s and \(CT=1.92\) s: \[ \frac{12}{1.92}=6.25\;\Rightarrow\;7 \] **3. Conclude:** We round up because stations cannot be fractional. Answer: \(7\).

Report a correction for Q287

Question 288 NAT · 1.0 marks

Source diagram or notation
Based on the above data, answer the given subquestions.
What is the minimum cycle time of the system? (in min)

Published solution

**1. Concept:** The cycle time of a line cannot be smaller than the longest single activity, because an activity cannot be split between stations. **2. Activity times (min):** 5, 4, 12, 9, 10, 8, 7, 6, 9, 3, 5, 7. The longest is activity 3 with 12 min. **3. Conclude:** The minimum cycle time is 12 min. Answer: \(12\).

Report a correction for Q288

Question 289 NAT · 1.0 marks

Source diagram or notation
Based on the above data, answer the given subquestions.
What is the maximum cycle time of the system? (in min)

Published solution

**1. Concept:** The maximum cycle time occurs when all activities are done at a single workstation, so it equals the total work content. **2. Add the times:** \[ 5+4+12+9+10+8+7+6+9+3+5+7=85 \] **3. Conclude:** The maximum cycle time is 85 min. Answer: \(85\).

Report a correction for Q289

Question 290 NAT · 2.0 marks

Source diagram or notation
Based on the above data, answer the given subquestions.
What is the balance delay of the following layout (round it to two decimals) (1,2) -> (3) -> (4) -> (5) -> (6,7) -> (8,9) -> (10,11,12)

Published solution

**1. Station times (min):** (1,2): \(5+4=9\); (3): 12; (4): 9; (5): 10; (6,7): \(8+7=15\); (8,9): \(6+9=15\); (10,11,12): \(3+5+7=15\). **2. Find n and CT:** There are \(n=7\) stations. The cycle time is the largest station time, \(CT=15\) min. Total work content \(\sum t=85\). **3. Balance delay:** \[ D=\frac{nCT-\sum t}{nCT}\times100=\frac{105-85}{105}\times100=19.05\% \] Answer: \(19.05\) (about \(19.0\%\)). **Review note:** In the given station order, activity 5 comes before activity 6, but 6 must finish before 5 according to the diagram. The calculation below uses the station times exactly as the question gives them, which matches the supplied key.

Report a correction for Q290

Question 291 NAT · 1.0 marks

Source diagram or notation
Based on the above data, answer the given subquestions.
What is the efficiency of the layout, Mentioned in the previous question? (Round off to two decimals without percentage sign)

Published solution

**1. Use the station data:** \(n=7\), \(CT=15\) min, \(\sum t=85\) min. **2. Efficiency:** \[ \text{Efficiency}=\frac{\sum t}{nCT}\times100=\frac{85}{105}\times100=80.95\% \] Answer: \(80.95\). **Review note:** In the given station order, activity 5 comes before activity 6, but 6 must finish before 5 according to the diagram. The calculation below uses the station times exactly as the question gives them, which matches the supplied key.

Report a correction for Q291

Question 292 MCQ · 1.0 marks

Source diagram or notation
Based on the above data, answer the given subquestions.
The factory works for one 8-hour shifts each day. Is it possible to achieve an output of 32 units/day.
6406533823064.
Yes
6406533823065.
No   

A published solution is not available for this question yet.

Report a correction for Q292